My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />COLORADO RIVER STORAGE PROJECT <br />SEEDSKADEE PARTICIPATING PROJECT <br />(Continued) <br /> <br />PROJECT FEATURES (continued) <br /> <br />Number <br /> <br />Combined <br />length <br />(miles) <br /> <br />Laterals <br /> <br />West Side system <br />East Side system <br />Big Sandy system <br /> <br />20 <br />7 <br />-L <br />35 <br /> <br />110.0 <br />20.1 <br />26.5 <br />156.6 <br /> <br />Total <br /> <br />Drains <br /> <br />Open subsurface drains (mi.) <br />Closed subsurface drains (mi.) <br />Surface drains (mi.) <br />Total <br /> <br />. <br /> <br />HYDROLOGY <br /> <br />Green River at Fontenelle Dam site <br /> <br />Drainage area (Sq mi) <br />Average annual runoff-- 1931-55 (acre-feet) <br />Maximum annual runoff -- 1951 (acre-feet) <br />Minimum annual runoff -- 1934 (acre-feet) <br />Inflow design flood, volume 20 days (acre-feet) <br />, Inflow design flood, peak discharge (cfs) <br /> <br />REMARKS <br /> <br />Initial <br />capacities <br />(cfs) <br /> <br />350 to 10 <br />70 to 10 <br />110 to 10 <br /> <br />119 <br />53 <br />-.1Z <br />219 <br /> <br />'4,200 <br />I,O~3,900 <br />1,831,000 <br />337,000 <br />938,000 <br />54,500 <br /> <br />I. <br /> <br />A conservancy district will be organized as the project contracting <br />organization but such a district will not be formed until 25 percent <br />of the proj ect lands have been settled. Due to the recent discovery <br />of trona deposits under certain areas of the project lands, 'it became <br />necessary to make a reevaluation of the project itself. This reevalu- <br />ation is now under way. <br /> <br />. <br /> <br />-38- <br /> <br />-"" <br />
The URL can be used to link to this page
Your browser does not support the video tag.