My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />COLORADO RIVER STORAGE PROJECT <br />HAMMOND PARTICIPATING PROJECT <br /> <br />LOCATION: <br /> <br />Northwestern New Mexico, across the San Juan River and <br />south of Blanco, Bloomfield, and Farmington <br /> <br />AUTHORIZED: Authorized as a participating project with the Colorado <br />River Storage Project by the Act of April 11, 1956 <br />(70 Stat. 105). <br /> <br />PLAN: <br /> <br />. <br /> <br />A full irrigation supply will be provided from the San Juan River' <br />for 3,900 acres of land. Most of the supply will be obtained from <br />direct diversions of natural streamflow but when necessary natw:al <br />" <br />flows will be supplemented by storage releases from the Navajo Res- <br />ervoir being constructed on the San Juan River as part of the Colo- <br />rado River Storage Project. Water will be diverted from the l'tver <br />by the Hammond DiverSion Dam and turned into the 29-mile lqng Main <br />Canal. At a point 6.3 miles below the head of the canal tile water <br />will be divided for distribution at three levels. Part of the water <br />will drop through a hydraulic turbine to a continuation of thl3 Main <br />Canal; part will be lifted to the East and West Highline Laterals <br />by a pump driven by the turbine; and the remainder will be 'diverted <br />by gravity flow into the Gravity Extension Lateral. Smaller gravity <br />diversions will be made from the Main Canal by five minor unnamed <br />laterals. A project headquarters will be constructed near the pump- <br />ing plant. Land drains will bl3 provided as needed. Irrigat:ipn and <br />upland game and waterfowl will benefit from the project. <br /> <br />COSTS: <br /> <br />. <br /> <br />Construction Costsll <br />Hammond Diversion Dam Section 5 (Basin Fund) $ 451,000 <br />Hilmmond Pumping Plant " 369; pOO <br />Main Canal "2, 106, ~OO <br />Laterals "204,000 <br />Drains "90,000 <br />Permanent Operating Facilities" 36,000 <br />O&M Housing "~2.000 <br />Subtotal 3,~80,000 <br />Fish & Wildlife Facilities Section 8 funds 10.000 <br />Total $3,290,000 <br />J/ Section 5 (Basin Fund) costs are estimated at September <br />1957 prices and include $7,697 expendl3d from nonreimbursable <br />Colorado River Devl3lopment Fund. <br /> <br />-32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.