Laserfiche WebLink
<br /> <br />. <br /> <br />COLORADO RIVER STORAGE PROJECT <br />SMITH FORK PARTICIPATING PROJECT <br />(Continued) <br /> <br />HYDROLOGY - Continued <br />Maximum 24-hour volume (acre-feet) <br />Smith Fork Diversion Dam 100-year peak (second-feet) <br />J/ Period 1942 to 1956, inclusive. <br />Y Includes Saddle Mountain ditch diversions which bypass <br />the gage. <br /> <br />5,560 <br />2,000 <br /> <br />REMARKS <br /> <br />The Crawford Water Conservancy District, including the town of <br />Crawford and all irrigable project lands, was formed in May 1957. <br />Representatives of the district indicated a willingness to enter <br />into a contract with the United States for repayment of project <br />costs up to the ability of the district. Repayment contract nego- <br />tiations were completed and a contract was executfjld on May 10, 1960. <br />A contract for construction of the Crawford Dam was awarded on <br />September 16, 1960. <br /> <br />. <br /> <br />. <br /> <br />-30- <br /> <br />