My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJECT <br /> <br />. <br /> <br />CENTRAL UTAH PARTICIPATING PROJECT <br />VERNAL UNIT <br /> <br />LOCATION: <br /> <br />Northeast Utah in Ashley Valley of the Uintah Basin, <br />approximately centered around Vernal, Utah. <br /> <br />AUTHORIZED: <br /> <br />Initial phase of the Central Utah project, including th~ <br />Vernal unit, authorized as a participating project with' <br />toe Colorado River Storage project by the Act of April p, <br />1956 (70 Stat. 105). <br /> <br />PLAN: <br /> <br />. <br /> <br />Thrqugh storage regulation and water exchanges, the Vernal unit <br />will provide supplemental irrigation water for 14,700 acres of ' <br />land and 1,600 acre-feet of water annually to supplement tOe <br />municipal supplies of Vernal, Naples, Maeser, and surrounding <br />'", areas. The unit will also provide benefits to fish and wildlife <br />and recreation. Excess flows of Ashley Creek will be diverted <br />at the Ft. Thornburgh Diversion Dam into the Stan<lker Feeder <br />Cane!l and conveyed to the Stanaker Reservoir. Water stored in <br />the reservoir will be released into the Stanaker Service Canj:ll <br />and delivered to existing irrigation canals and ditches. The <br />water will in part replace Ashley Creek water, inClUding releases <br />from upstream reservoirs. Some of the replaced water will be <br />used on lands above the Stanaker Service Canal and some w~ll <br />be diverted from Ashley Spring on Ashley Creek into the mun~cipal <br />pipeline. Land drains will be provided as needed and some <br />sections of existing canals will be lined to prevent seepage. ' <br />A pipe system will be constructed for stock-watering purposes , <br />during the nonirrigation season to save for unit storage and use <br />water now lost through open canals. Recreational and fishing <br />attractions will be provided at Stanaker ~eservoir. Small tracts, <br />of land distributed through the unit area 'fill be acquired and <br />developed for upland game, and a pump and pipeline will be <br />installed to deliver water from Green River to the Stewart Lake <br />State Refuge. Repayment of reimbursable construction costs <br />will be cOlnplete in 50 years, follOWing a 3-year development <br />period. Irrigation costs that are beyond the repayment ability <br />of the irrigators will be paid from the Upper Colorado River <br />Basin Fund apportioned to Utah. <br /> <br />. <br /> <br />-24- <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.