My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJECT <br />FLAMING GORGE UNIT <br /> <br />. <br /> <br />LOCATION: <br /> <br />Upper Colorado River Basin. Storage dam and powerplant <br />on Green River in northern Utah about 6 miles south of <br />Utah-Wyoming border. <br /> <br />AUTHORIZATION: <br />Public Law 485, 84th Congress, 2nd Session (70 Stat. 109), <br />approved April 11 , 1956, and Public Law 85-529 (74 Stat. <br />225), approved June 27, 1960. <br /> <br />PLAN <br /> <br />Flaming Gorge unit will regulate the flow of Green River for power <br />generation and, by exchange, for consumptive use of water. Other <br />purposes include recreation, fish and wildlife propagation, and flood <br />control to a minor extent. Unit features include a dam and reservoir, <br />powerplant, switchyard, and general property which primarily involves <br />structures and improvements at the new town of Dutch John, Utah, <br />established as a residence for personnel connected with construction <br />and operation of the unit. A transmissiop. sy~tem will be provided <br />as part of the Transmission division of the.COlQrado River Storage <br />project. Facilities will be provided for: recreatiOP and fish and <br />wildlife propagation by the National Pilirk Servic~l and the Bureau of <br />Sport Fisheries and Wildlife. <br /> <br />. <br /> <br />COSTS (Federal) <br /> <br />Construction <br />Section 5 (Basin Fund) costs 11 <br />Flaming Gorge Dam and Reservoir <br />Flaming Gorge powerplant & switch)>ard <br />General pr.Operty <br />Total <br /> <br />Section 8 costs <br />National Park Service (recreation) <br />Bureau of Sports Fisheries & Wildlife <br />Total <br />Grand Total <br /> <br />Annual Operation, Maintenance and Replacements <br />Bureau facilities Y$ <br />National Park Service (recreation) <br />Bureau of Sports Fisheries & Wildlife <br />\ ,.. <br />Total' $ <br /> <br />. <br /> <br />$ 46,145,000 <br /> 17 , 24f, 000 <br /> 3,205,000 <br /> 66, ~91,OOO <br /> 3,109,000 <br /> 1,198,000 <br /> 4,207,000 <br />$ 70,898,odo <br /> <br />469,qOO <br />346,(')00 <br />State cpst <br />815,000 <br /> <br />11 Based on current value of awarded conp-acts and on esti}llated <br />cost of completion, USing 1960 price levels. .' , i <br />Y Based on 1960 prides with replaoements computeq, using a <br />2 7/8 peroent Sinking fUnd, ' <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.