<br />Construction Activities
<br />
<br />
<br />Val Tunnel showing I,beam bracing and water
<br />discharge line
<br />
<br />The major construction activities of the
<br />Upper Colorado Regional office are in the
<br />Bonneville Unit and Jensen Unit of the
<br />Central Utah Project; the Colorado River
<br />Storage Project, the Lyman Project
<br />Utah-Wyoming, the Dolores and Dallas
<br />Creek Project, and Colorado River Basin
<br />Salinity Control Project in Colorado.
<br />The primary features of the Bonneville
<br />Unit undergoing some construction or
<br />exploratory drilling are Vat Diversion Dam,
<br />Hades-Rhodes Tunnel. Stillwater Tunnel,
<br />Strawberry and Currant Creek Recreation
<br />roads, Soldier Creek Sewage Lagoons,
<br />Jordan Aqueduct, Reach 3: Jordanelle
<br />Dam and Reservoir, Vat Tunnel, Straw-
<br />berry Aqueduct, and Water Hollow Bridge.
<br />
<br />Construction on the primary feature of the
<br />Dallas Creek Project, Ridgway Dam, is
<br />progressing. The major feature of the
<br />Dolores Project, McPhee Dam, is under
<br />construction and ahead of schedule.
<br />The Government Highline 'Canal, Stage 1.
<br />Grand Valley Unit, Colorado River Basin
<br />Salinity Control Project is under con-
<br />struction and ahead of schedule.
<br />
<br />4
<br />
<br />
<br />Jordan Aqueduct Reach 3 - Consolidating material
<br />using two vibrators
<br />
<br />Bonneville Unit,
<br />Central Utah Project
<br />
<br />The work on the Vat Diversion Dam and
<br />Westfork Pipeline continued throughout
<br />
<br />
<br />~I-.,'-","'."'.':-,','"
<br />'., ...... ....'.. '.. '. ,,~:.'i\'04
<br />
<br />" . ~."
<br />':.:, .~)~,
<br />''''. .....,
<br />, .. .'
<br />
<br />c
<br />
<br />;
<br />
<br />r
<br />
<br />'''''
<br />
<br />
<br />~
<br />
<br />Looking east of Meeks Cabin Dam and Reservoir
<br />recreation area
<br />
<br />the year with 47 percent of it completed
<br />by the end of tiscal year 1980, The Still-
<br />water Tunnel completion is awaiting new
<br />specifications and bids for a new contract.
<br />A contract for engineering
<br />
<br />Construction Costs-Annual and Accumulated
<br />
<br /> Annual Accumulated
<br />Fiscal year 1971 $30,443,914
<br />To date as at 6/30/71 $ 885,045,259
<br />Fiscal year 1972 43,187,756
<br />To date as at 6/30/72 928,233,015
<br />Fiscal year 1973 46,588,918
<br />To date as at 6/30/73 974,821,933
<br />Fiscal year 1974 36,986,459
<br />To date as of 6/30/74 1,011,808,392
<br />Fiscal year 1975 52,303,718
<br />To date as at 6/30/75 1,064,112,110
<br />Fiscal year 1976 70,281,741
<br />To date as of 6/30/76 1,134,393,851
<br />Transitional quarter and
<br />fiscal year 1977 131,750,705
<br />To date as of 9/30/77 1,266,144,556
<br />Fiscal year 1978 89,001,375
<br />To date as of 9/30/78 1,355,145,931
<br />Fiscal year 1979 95,067,380
<br />To date as of 9/30/79 1,450,213,311
<br />Fiscal year 1980 130,357,851
<br />To date as of 9/30/80 1,580,571,162
<br />
|