My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07776
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:52 PM
Creation date
10/12/2006 2:35:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1980
Author
USDOI
Title
24th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Allocation and Repayments <br /> <br /> <br />.:~ <br />Scenic view of Red Fleet Dam and Reservoir <br /> <br />Allocation of Federal <br />Investment <br /> <br />A preliminary allocation of total estimated <br />costs of all authorized projects is sum- <br />marized in this table, <br /> <br />Allocations to the various purposes <br />authorized under Reclamation law are <br />required by Section 6 of Public Law <br />84-485, the Colorado River Storage <br />Project Act, excluding specific fish and <br />wildlife and recreation expenditures <br />authorized by See, 8 of this act. Final <br />allocation reports have been prepared on <br />the Colorado River Storage Project, and <br />on Emery County, Florida, Paonia, <br />Seedskadee, Silt, and Smith Fork Parti- <br />cipating Projects, and the Vernal Unit <br />of the Central Utah Project, <br /> <br />26 <br /> <br /> <br />Eight-inch concrete drain pipe at Jensen Drains <br /> <br />Project Costs Allocated <br />(Excludes Section 8 Costs) <br /> <br />Reimbursable Allocations: <br />Irrigation <br />Power <br />Municipal and Industrial Water <br />Other <br /> <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs <br />Archeological Preservation <br /> <br />Total <br /> <br />Other: <br />Navajo Indian Irrigation ProjecC <br /> <br />Total Costs Allocated <br /> <br />Section 8 Costs: <br />Fish and Wildlife <br />Recreation <br /> <br />Total Costs Not Allocated <br /> <br />Total <br /> <br />(Thousands <br />of Dollars) <br /> <br />1,546,047 <br />1,162,526 <br />633,650 <br />3,668 <br /> <br />3,345,891 <br /> <br />39,138 <br />231.740 <br />6,207 <br />21.751 <br />6,409 <br /> <br />305,245 <br /> <br />489.441 <br /> <br />4,140,577 <br /> <br />108,750 <br />138,998 <br /> <br />247,748 <br /> <br />4,388,325 <br /> <br />'Repayment 01 construction costs is subject to the act 01 <br />July 1, 1932 (47 Stat. 564) <br /> <br /> <br />~ J!..., <br /> <br />Ridgway Dam construction. <br /> <br />~ <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.