Laserfiche WebLink
<br />,'., __ ... ,..........v L.,.::J-LO...Jf <br /> <br />.L,_!' U::;) J..-j' '"+'/ 1'-/'_'. \...".1::;) I . '...!.....'/ J. <br /> <br /> <br />C"j RUUntl-L~l..d hay goose nest platforms, elevated and reinforced <br />M <br />(? with woven wire, will be placed north of the buoy line. Where high <br />M <br />(::J wate,' levels are eKpected, nesting islands wi 11 be constructed. Th/9 <br />~ <br />island surface area will extend three feet above the hlgh waterline and <br /> <br />be set at least fifteen feet in diameter. Bonks will be rip-rapped to <br /> <br />p,'event erosion. Nesting structures wi II bG at least 200 feet apart <br /> <br />and at least 200 feet from the low wat.er $hol'eline. <br /> <br />!'fn11!f!!_g~Y;!19Pm~n.!!L1YQr!hgnL!!!!jt <br /> <br />A beidge wi 11 be reconstructed with an elev;;tioll two feet hig'hel' <br />than the e>ltstj))g beidge, and designed with water co~lt:rol ability. <br /> <br />Wetland shoreline will be planted with wild mtllet and scurf pea as <br />fall food f()r waterfowL Wells, two, three and four will be evaluat.ed <br /> <br />as to cost/benefit values, and jf justified, redeveloped to reach their <br /> <br />adjudic"ted values. Well five h'ls been app1.ied for, but has not been <br /> <br />appt'Oved. Its rutlu'" use is contingent on approval of the required <br />permits. Nesting islands and/or pJl'ltfonns will be constructed in /lead <br /> <br />Lake. Signs will be necessary to control public use of the northern <br /> <br />"'. <br /> <br />uni t. <br /> <br />BUREAU OF RECLAMATION <br /> <br /> <br />DEPAR1Mi';NT OF NATURAL RESOURC~;S <br /> <br />Cost-Share Agrecment <br /> <br /> <br />Developments by the DOW nor'th of the wildlife-rec,'eal:ion boundary <br /> <br /> <br />line (e"eluding BOR water systems or project needs) are the financial <br /> <br />responsibility of the DOll'. South of that boundal'Y, the Lease Agl"f.,,,,ment <br />and Contt-act (1985) stipulates that the State of Colorado, Department <br />, <br /> <br /> <br />of Natu,'al Resources, wtll pay 25 per'cent of the Closed Basin Project <br /> <br />fish and wild1_ife enhl'\ncement costs and 60 percent of the r-"cretltional <br /> <br />enhancement costs. Separable 'ilpecific wildlife developments will be <br /> <br /> <br />CO$t shal'ed 25 percent DOll' and 75 percent BaR. Separ,>ble specifiC <br /> <br /> <br />.-,.' <br /> <br />recnmtion developments w111 b~ cost shared 50:50 between GWCll and BaR. <br /> <br />e._: <br /> <br />5 <br /> <br />- <br />