<br />CHAPTER IV <br /> <br />ALTERNATiVES <br /> <br />. <br /> <br />The Glen....ood Springs collect ion system ....ould be connected to the <br />conveyance pipeline through a header pipe and pump system. The header <br />pipe would be similar to the pipe used near Dotsero. <br /> <br />W <br /><:,il <br />o <br />~~ <br /> <br />Pump stations ....ould pump spring flows in lo....-lying areas to the <br />conveyance pipeline. The pump stations would utilize the available <br />pressure in the pipeline to run the plIl\pS ....hich would be equipped with <br />one alternative self-priming vertical turbine pump and ....ith emergency <br />overflow structures. <br /> <br />A river crossing would be required to connect Glen la, 20, and 30-40 <br />to the conveyance pipeline. This crossing would consi9l of a 14-inch <br />fiberglass pipe enclosed in a larger pipe and buried under the river. <br /> <br />The flow collected from Glen la, 20, and 30-40 ....ould be piped to the <br />north side of the river ....here it would be joined by the flo.... from Glen 12 <br />and lifted to the conveyance pipeline by a plJtlp station. A second p1.Dllp <br />station would lift the flow8 from Glen 50, 60, and 70 into the pipeline, <br />while a third station located near Glen 100 would lift the flows from <br />Glen 90 and 100 and the alluvial ....ell field into the pipeline. <br /> <br />Areas impacted by construction of the <br />revegetated. The collect ion system ....ould <br />about 10 years. <br /> <br />collection system <br />have an est imated <br /> <br />would <br />1 ife <br /> <br />be <br />of <br /> <br />. <br /> <br />Conveyance system.--The conveyance system from Dotsero and Glenwood <br />Springs to the evaporation pond site near Mack would consist of 131 miles <br />of concrete pressure pipeline. For 15 mile~ from Dotsero to Glenwood <br />Springs, the pipe ....ould have a diameter of 27 inches and a capacity of <br />14.2 cfs. From Glenwood Springs to the pond site, a distance of 116 <br />miles, the pipeline would have a diameter of 36 inches and a capacity of <br />25.9 cfs. The pipeline was sized for 20 percent more than the average <br />flow to be collected to accommodate expected fluctuations. In Glenwood <br />Canyon, the pipeline ....ould follow the proposed alignment of 1-70. Where <br />the highway crossed the river. the pipeline would be suspended from the <br />highway structures. tn areas outside of Glenwood Canyon, the pipeline <br />would probably be buried under the highway right-of-way. The pipeline <br />would be buried with a minimum cover of 3 feet. <br /> <br />Cofferdams would be required for some construction activities In- <br />volving river crossings. These activities would be scheduled during the <br />late summer to avoid the high water and fish spawning periods. For other <br />construction activities, preferable construction periods would be July <br />through October for the pipeline and March through November for the col- <br />lection sites. <br /> <br />The pipeline would generally follow 1-70 and Highway 6 for 123 miles <br />from Dotsero to Mack, then proceed overland in 8 north....esterly direction <br />for approximately 8 miles to the evaporation pond site. Pipeline rights- <br />of-way would be revegetated. <br /> <br />. <br /> <br />The pipeline would include line isolation valves, blowoff valves, <br />pressure reduction stations, pressure relief valves, air/vacuum relief <br /> <br />23 <br />