Laserfiche WebLink
<br />Table <br /> <br />25 <br /> <br />26 <br /> <br />27 <br /> <br />28 <br />29 <br />30 <br />31 <br /> <br />32 <br /> <br />C) <br />~ <br />~ <br />~ <br />~ <br />Q <br /> <br />Tables - Continued <br /> <br />Title <br /> <br />Flood Control Features of Waterflow Retardation <br />Structures - Red River Basin above Lake Texoma <br />Major Flood Control Structures - Red River Basin <br />above Lake Texoma <br />Sediment Reserve Space in Waterflow Retardation <br />Structures - Washita River Basin <br />FOBS Reservoir Operation <br />Mountain View Reservoir Operation <br />Fort Cobb Reservoir Operation <br />Foss, Mountain View and Fort Cobb Projects - <br />Shortages, Depletions, Spill and Return Flow <br />Summary of Reservoirs in Flood Control Plans - <br />Washita River Basin <br /> <br />Illustrations <br />(Bound at back of section) <br /> <br />Plate No. Title <br /> <br />1 Precipitation Data <br />2 Temperature Data <br />3 Isopleths of Average Quration for Freeze Free Seasons <br />of 28 Degrees <br />4 Rainfall and Runoff <br />5 Chemical Quality of Surface Waters <br />6 Ground-Water Availability <br />7 Ground-Water Provinces <br /> <br />xi <br /> <br />Page No. <br /> <br /> <br />102 <br /> <br />102 <br /> <br />105 <br />106 <br />106 <br />107 <br /> <br />108 <br /> <br />115 <br />