My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07715
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:39 PM
Creation date
10/12/2006 2:33:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.09.I
Description
Navajo Project
State
AZ
Basin
Colorado Mainstem
Date
2/4/1972
Title
Navajo Project: Final Environmental Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.....' <br /> <br />..... <br />.- <br />-:: <br /> <br />C' <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />Page <br /> <br />3. Water Supply for Mining , . . 87 <br />4. Environmental Considerations . 88 <br />D. Evaluation of Environmental Impact 90 <br />1. The Probable Impact of the Proposed Action on <br />the Environment . . . . . . . . . . . . . 90 <br />2. Any Probable Adverse Environmental Effects Which <br />Cannot be Avoided Should the Proposal be <br />Implemented . . . . . . . . , . . . . . . 92 <br />3. Alternatives to the Proposed Action 92 <br />4. The Relationship Between Local Short-term <br />Uses of Man's Environment and the Maintenance <br />and Enhancement of Long-term Productivity 93 <br />5. Any Irreversible and Irretrievable Commitments <br />of Resources Which Would be Involved in the <br />Proposed Action Should it be Implemented 93 <br />E. Further Studies Needed . 94 <br /> <br />VI. SOUTHERN TRANSMISSION SYSTEM <br />A. General . . . . . . . . <br />B. Environmental Setting of Lines <br />C. Plan of Development <br />D. Evaluation of Environmental Impact <br />1. The Probable Impact of the Proposed Action <br />on the Environment . . . . . . . . . . . . <br />2. Any Probable Adverse Environmental Effects <br />Which Cannot be Avoided Should the ,Proposal <br />be Implemented . . . . . . . . . . . . . . . <br />3. Alternatives to the Proposed Action . . . . <br />4. The Relationship Between Local Short-term Uses <br />of Man's Environment and the Maintenance and <br />Enhancement of Long-term productivity . . . . <br />5. Any Irreversible and Irretrievable Commitments <br />of Resources Which Would be Involved in the <br />Proposed Action Should it be Implemented <br />E. Hearings . . . . . . . . <br /> <br />95 <br />95 <br />96 <br />96 <br />97 <br />97 <br /> <br />98 <br />98 <br /> <br />100 <br /> <br />100 <br />100 <br /> <br />VII. WESTERN TRANSMISSION SYSTEM <br />A. General . . . . . . . . <br />B. Environmental Setting of Line <br />C. Construction Plan . . . <br />D. Evaluation of Environmental Impact . <br />1. The Probable Impact of the Proposed Action <br />on the Environment ,., ." .. <br /> <br />101 <br />101 <br />102 <br />102 <br />103 <br /> <br />103 <br /> <br />xv <br />
The URL can be used to link to this page
Your browser does not support the video tag.