Laserfiche WebLink
<br />Item <br />Table S-l <br />Table S-2 <br />Table 2-1 <br />Table 2-2 <br />Table 3-1 <br />Table 3-2 <br />Table 3-3 <br />Table 3-4 <br />Table 3-5 <br />Table 3-6 <br />Table 4-1 <br />Table 4-2 <br />Table 4-3 <br />Table 4-4 <br />Table 4-5 <br />Table 4-6 <br />Table 4-7 <br /> <br />BIG SANDY RIVER UNIT <br />LIST OF ILLUSTRATIONS <br /> <br />Title <br /> <br />Summary of Environmental Impacts <br /> <br />Summary of Economic and <br />Social Well Bein~ Impacts <br /> <br />Same as Table S-l <br /> <br />Same as Table S-2 <br /> <br />List of Salinity Control, Fish and Wildlife, <br />and Soil Conservation Practices <br /> <br />Selected Plan - Installation Cost Distribution <br /> <br />Selected Plan - Project Installation <br />Cost Analysis <br /> <br />Present Condition vs. Future-With Project <br /> <br />Selected Plan ~ Average Annual Cost-Benefit <br />Analysis <br /> <br />Selected Plan - Installation Schedule <br /> <br />Historic Evaluation vs. Present Condition <br /> <br />Irrigation Water Budget For Eden Valley <br />Irrigation Project for 1960-1977 <br /> <br />Present Irrigation System and Land Use <br />Distribution Eden Valley Irrigation Project - 1985 <br /> <br />Big Sandy Water Budget, 1960-1977 <br /> <br />Big Sandy Salt Load Analysis. 1960-1977 <br /> <br />Wetland Inventory by Type <br /> <br />Wetland Inventory by Water Source <br /> <br />Page <br /> <br />S-5 <br /> <br />S-6 <br /> <br />2-16 <br /> <br />2-17 <br /> <br />3-2 <br /> <br />3-4 <br /> <br />3-5 <br /> <br />3-6 <br /> <br />3-8 <br /> <br />3-9 <br /> <br />4-3 <br /> <br />4-5 <br /> <br />4-6 <br /> <br />4-7 <br /> <br />4-9 <br /> <br />4-23 <br /> <br />4-23 <br /> <br />l'1J'r f ':9 <br />I I.. ..IV <br /> <br />Hi <br />