My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07684
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:26 PM
Creation date
10/12/2006 2:32:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 3
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: 16 <br /> <br />I. Project Title: Database Management Program <br /> <br />II. Principal Investigator(s): <br /> <br />Frank K. Pfeifer, Project Leader <br />Charles W. McAda, Fishery Biologist <br />764 Horizon Drive, South Annex A <br />Grand Junction, Colorado 81506 <br />(970 245-9319; FAX 245-6933 <br />Frank Pfeifer@FWS.GOV <br />Chuck=McAda@FWS.GOV <br /> <br />III. Project Summary: <br /> <br />Development of a centralized database was an initial requirement of <br />the Recovery Program. The Service's Grand Junction Office was <br />instrumental in developing the database and has managed it since <br />1986. Participants are required to submit their data in Dbase files. <br />File structure is flexible, but participants are requested to use <br />established field names when appropriate. The Database Manager <br />catalogs the files as they are submitted and prepares basic <br />documentation. Lists of endangered fishes tagged with PIT tags are <br />submitted and consolidated annually. All remaining data collected as <br />part of studies funded by the Recovery Program are required to be <br />submitted to the Database when the final report is submitted. <br /> <br />IV. Study Schedule: Scheduled to continue for the length of the Recovery <br />Program. <br /> <br />V. Relationship to RIPRAP: <br /> <br />General Recovery Program Support Action Plan. V.A.2. Conduct <br />interagency data management program to compile, manage, and maintain, <br />all research and monitoring data collected by the Recovery Program. <br /> <br />VI. Accomplishment of FY 97 Tasks and Deliverables, Discussion of Initial <br />Findings and Shortcomings: <br /> <br />Data have been catagloged as received. <br /> <br />All PIT tag data received were checked for errors. Several minor <br />errors were found and clarified with the original investigators.. <br /> <br />Work on the 1997 combined tagging list is ongoing. <br /> <br />Large amounts of data are expected in 1998 as the large number of <br />studies funded under the Aspinall and Flaming Gorge Umbrellas are <br />completed. <br /> <br />VII. Recommendations: Continue the database program. <br /> <br />VIII. <br /> <br />Project Status: Project is on track. Scheduled to continue through <br />the length of the Recovery Program. <br /> <br />IX. FY 97 Budget <br /> <br />A. Funds Provided: <br />B. Funds Expended: <br />C. Difference: <br />D. Publication Charges: <br /> <br />28.2 K <br />28.2 K <br />o <br />o <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.