My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07622
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:09 PM
Creation date
10/12/2006 2:29:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Author
DOI BOR
Title
Salinity Update - January 1987 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />00 <br />w <br />o <br /> <br />f. <br /> <br />- <br />_ I. <br /> <br />- <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br />. <br /> <br />- <br /> <br />- <br />- <br /> <br />.~= <br /> <br />- .:: <br />- . <br /> <br />- - g <br /> <br />- <br /> <br />--- ~ <br /> <br />- <br />,.,.;::= <br /> <br />- <br />- <br />- <br />- <br />,- <br />- <br /> <br />- <br />" <br /> <br />" <br /> <br />- ;:: <br /> <br />.- <br /> <br />:r. <br /> <br />, <br /> <br />" <br /> <br />, <br /> <br />, <br /> <br />, <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />, <br /> <br />n ;lUll llll~q !''!.I.-}(llIq 111 .\ l!{JIJ'~~ <br /> <br />, ~ <br /> <br />Fi&ur~ I. - Salinity projections with and wo additional <br />controls. <br /> <br />hl~h f1o"'> for the pd~l rr:v. yeaH ha\C' <br />lemporanl) lo..err:d ~hnity le\r:b in the <br />~y>lem. An) delay ....\)uld impao;l pro8ram <br />I.:onlinuil) and "u'l\t' .erKlll. intc:rruption <br />III Ihe Jon~-lerm lmpr()\emenl of lrTl~a- <br />llun la':lhtle~ and on farm prOjt'>.:l\. a\ <br />",ell a~ fe\uh in luture unreall,lK iunding <br />re'lue,C, from the ConlEre". <br />rhr: JeaM ro,[ 1n'6ImC'n! ..:ompulc:r <br />mvJd, de,eloped by RedamatlOn and <br />(olorado Stair: L'nl\er'll). ....iI.\ USN to <br />t'\...Juale proje..:r In\t',lmenl 1eH'j, Tht' <br />re'ult\, modifit"u \0 meet pwgram ne-cd, <br />dflJ cOntmully, 1\ an in,e;,lffienl of about <br /> <br />5498 million The associated construction <br />schedule' i~ ~ho'" n in figure ~. <br />The basm"'lde program mu~t be de\el- <br />opt"(! ~omidering the un~ertaintie~ of Im- <br />plementation in the te.:hmcal. sex:ial. <br />polit'cal. imtitutional, and Itgal arenas. <br />Local l:oncrrm and needs, management <br />of ITrl8atlon systems, and regional 1m- <br />pa..:t\ are in\"ohed in the final sele.:tion of <br />an Implementation schedule <br />The analysis i~ ba~ed on January 191't> <br />dala. Annual re\ Ie'" is needed 10 update <br />proJe~-t data, 10 re\lC'''' program obje~. <br />tlses to determme If lhe~ de,'iate 'Ignlfl- <br /> <br />. <br /> <br />..:antly, and to <:onfirm the validity that <br />the in\estment level of S~l,l8 million ....ill <br />\atisf~ the program obje.:ti'C'o. <br /> <br />Major Findin~s <br /> <br />. The recommended plan ....Ill fully <br />salisfy the ~alt load redu..:lion obje~ti\'e <br />(1.09 million IOns per year by 2010) <br />and the pro8ram goal of maintaining <br />numeri~ ~nteria belo.... 879 mg/L at <br />Imperial Dam <br />. Total construclIon cost for the <br />program IS proje..:ted 10 be S~98 <br />million, significantly less than estimale, <br />of $1.9 billion in 1l,l83. This S498 <br />million iO\estment le\'el appears to heM <br />satisfy the remainmg long-term <br />requlfements ....ith least investment cost. <br />. To meet the program obj<<;tise and <br />goab, comtru..:tion of most of the <br />proie\:ts mu<;( be initiated no later than <br />1991. <br />. To meel the ,all load redu..:tion <br />objC'cti\es, it IS necessary to have a mix <br />of both USDA and [)Ol projects. <br />. To meet the program needs beyond the <br />next dC"Cade, to minimize Lo"'er Ra~in <br />inlerest costs, and to maintain program <br />..:ontinull}', construction of se\eral ne.... <br />projC"Cts n~s 10 be initiated in the <br />next ~ years, <br />. An analysis of the repayment abiliTy of <br />the Lo....er Colorado River Ba.,in Fund <br />sho....s that sufficient funds are <br />available to cover the l.o"er Basin <br />Slales share of all COMS (capital. O&~l. <br />inleresl, and 3.8 pcrl:ent innalion) for <br />the S~98 million recommended plan. <br />. Continued do'>t' Federal and State <br />coordination among Intenor, USDA, <br />the Inl~ra8enc) Commillec', the Colo- <br />rado Riv'er Bobin Salinity Control <br />\d\'i~ory Coun..:il and Forum is criti..:al <br />to conlinued effeCli\'e managemenf of <br />the program. <br />. The evaluation ""ill n<<-d 10 be revie"'ed <br />annually to al1o"" for indu\ion of <br />ne....ly formulated. more cost-effe.:ti\'e <br />pro)e":h and ..:han~e~ in tC"Chnology to <br />a~\ure meeting program Ob)ecliv~ al <br />lea.'l co~t <br />
The URL can be used to link to this page
Your browser does not support the video tag.