My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07597
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:02 PM
Creation date
10/12/2006 2:28:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
Rio Grande Project
State
CO
Basin
Rio Grande
Date
8/11/1977
Title
1975 Water Assessment Rio Grande Region Activity 4 Phase II part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TEXAS WATER RIGHTS COMMISSION <br /> <br />STEPHEN F. AUSTIN STATE OFFICE BUILDING <br /> <br />COMMISSIONERS <br /> <br />July 13, 1977 <br /> <br />R. E. (BOB) SCHNEIDER <br />EXECUTIVE DIRECTOR <br />475-2452 <br />MARY ANN HEFNER <br /> <br />JOE D. CARTER, CHAIRMAN. <br />475-2453 <br /> <br />DORSEY B. HARDEMAN <br />475-4325 <br /> <br />JOE R. CARROLL <br />475.2451 <br /> <br />SECRETARY <br />475-4514 <br /> <br />Mr. K. B. Schroeder <br />Study Director <br />U. S. Water Resources Council <br />1975 Water Assessment <br />P. O. Box 252 <br />Albuquerque, New Mexico 87103 <br /> <br />Re: U.S. Water Resources Council -- Draft <br />Technical Memorandum 4, Specific <br />Problem Analysis Summary Report, <br />1975 National Water Assessment, Rio <br />Grande Region, June 1977. <br /> <br />Dear Mr. Schroeder: <br /> <br />This is in reply to your June 30, 1977, letter addressed to our <br />coordinating committee representative, Dr. Alfred J. D'Arezzo, request- <br />ing review comments by August 8, 1977. <br /> <br />The staff of the Texas Water Rights Commission has reviewed the <br />referenced document and find that the bulk of our detailed comments and <br />recommendations involving proposed changes, which were submitted to <br />you by our letter of May 16, 1977, appear to have been considered care- <br />fully and incorporated in the referenced document. Our May 16 comments <br />and recommendations were relative to the document entitled: "Draft <br />Te.chnical Memorandum, Activity 3, Phase II, Specific Problem Analysis, <br />1975 National Assessment, Rio Grande Region, Bureau of Reclamation <br />(April 1977), " which you transmitted to all members of the Rio Grande <br />Coordinating Committee by memorandum dated May 2, 1977. <br /> <br />In addition, we find that the bulk of our May 16 comments and recom- <br />mendations appear to have been considered carefully and incorporated in <br />the final, revised June 1977, copy of the above-cited Activity 3, Phase II <br />Technical Memorandum, which you forwarded to Mr. Gary D. Cobb, <br />Acting Director, U.S. Water Resources Council, Washington, D.C. <br /> <br />003141 <br /> <br />92 <br />AN eQUAL OPPORTUNITY EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.