My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07593
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:01 PM
Creation date
10/12/2006 2:28:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
White River General
State
CO
Basin
Yampa/White
Water Division
6
Date
9/1/1996
Author
USFS
Title
Aspen Highlands Ski Area - Draft Environmental Impact Statement - Summary
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Q~2:J96 <br /> <br />Summary <br />base area ski terrain, and improvement of roads servicing the ski area. In addition, the Moore Family Partnership <br />has proposed installing a ski lift from the High School to near the upper terminal of the existing Thunderbowl <br />Lift. This lift would be used by students, Aspen Ski Club panicipants, and local area residents and would help <br />reduce vehicular trips on the Maroon Creek Road and facilitate skier egress, but it would not increase initial <br />access capacity because it would not be directly linked to on-mountain distributioo lifts. <br /> <br />ALTERNATIVE B . PROPOSED ALTERNATIVE <br />As with the No Action Alternative, several previously approved actions that have not yet been implemented <br />would also take place under and be pan of Alternative B. The clements of Alternative B would be implemented <br />in two phases. The specific actions proposed for Phase I would include (Figure I): <br /> <br />., Replace existing Thunderbowl and Golden Horn lifts with a new quad chairlift (Thunderbowllift). <br /> <br />., Construct Steeplechase Lift to serve existing and 90 acres of new advanced and expert terrain. <br /> <br />., Clear a new catwalk from mid-mountain to the base of the new Steeplechase Lift (Steeplechase Catwalk). <br /> <br />., Extend existing Olympic Bowl Catwalk to serve the Loge Bowl (Loge Bowl Catwalk). <br /> <br />., Replace existing Merry-Go-Round restaurant with a new restaurant in the same general location. <br /> <br />., Relocate the ski patrol headquarters from the top of the Cloud Nine Lift to south of the Loge Peak Lift. The <br />new facility would include public restrooms and a Forest Service interpretive center. <br /> <br />The specific actions proposed for Phase IT would include: <br /> <br />., Add Highland Bowl Lift and ] 90 acres of mainly advanced and expen terrain in Highland Bowl. <br /> <br />., Add Maroon Bowl Lift and ] 89 acres of advanced and expen terrain in Maroon Bowl. <br /> <br />., Construct a catwalk between the Steeplechase and Highland Bowl lifts (Highland Bowl Catwalk). <br /> <br />. Extend snowmaking capability to cover an additional 227 acres of ski terrain (to reach a total of about 303 <br />acres) from the base area to Loge Peak. <br /> <br />The technical descriptions of the Thunderbowl, Steeplechase. Highland Bowl, and Maroon BowlliflS are shown <br />in Tab]e 3. The Thunderbowl, Steeplechase, and Maroon Bow] lifts would be top driven with power supplied <br />underground along existing or new ski trails or catwalks. The Highland Bowl Lift would be driven from the <br />bottom terminal with power supplied underground along the proposed Highland Bowl Catwalk from the base of <br />the Steeplechase Lift. The new Thunderbowl Lift would provide access to 96 acres of intermediate and advanced <br />skiing terrain; the Steeplechase Lift would provide access to 209 acres of gladed, advanced, and expen terrain; <br />the Highland Bowl Lift would provide access to about ]52 acres of open-bowl, advanced, and expert terrain; and <br />the Maroon Bow] Lift would provide access to about] 89 acres of expen-only bowl terrain. <br /> <br />Under Alternative B,live tree removal would be limited as much as possible to the lift line and catwalk corridors. <br />Lift corridors would be cleared to a minimum of 60 feet wide in forested stands to meet the Co]orado State <br />Passenger Tramway Safety Board (PTSB) standards. Additional disturbance within the corridor would include <br />excavation of tower foundations and lift tenninals. The proposed alignment of the Steeplechase Lift was selected <br />to minimize disturbance of avalanche staning zones and to follow a previously cleared survey line. <br /> <br />Sectionll <br />Alternalivu COlUjdLred ill DdaU <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.