Laserfiche WebLink
<br />Q~2:J96 <br /> <br />Summary <br />base area ski terrain, and improvement of roads servicing the ski area. In addition, the Moore Family Partnership <br />has proposed installing a ski lift from the High School to near the upper terminal of the existing Thunderbowl <br />Lift. This lift would be used by students, Aspen Ski Club panicipants, and local area residents and would help <br />reduce vehicular trips on the Maroon Creek Road and facilitate skier egress, but it would not increase initial <br />access capacity because it would not be directly linked to on-mountain distributioo lifts. <br /> <br />ALTERNATIVE B . PROPOSED ALTERNATIVE <br />As with the No Action Alternative, several previously approved actions that have not yet been implemented <br />would also take place under and be pan of Alternative B. The clements of Alternative B would be implemented <br />in two phases. The specific actions proposed for Phase I would include (Figure I): <br /> <br />., Replace existing Thunderbowl and Golden Horn lifts with a new quad chairlift (Thunderbowllift). <br /> <br />., Construct Steeplechase Lift to serve existing and 90 acres of new advanced and expert terrain. <br /> <br />., Clear a new catwalk from mid-mountain to the base of the new Steeplechase Lift (Steeplechase Catwalk). <br /> <br />., Extend existing Olympic Bowl Catwalk to serve the Loge Bowl (Loge Bowl Catwalk). <br /> <br />., Replace existing Merry-Go-Round restaurant with a new restaurant in the same general location. <br /> <br />., Relocate the ski patrol headquarters from the top of the Cloud Nine Lift to south of the Loge Peak Lift. The <br />new facility would include public restrooms and a Forest Service interpretive center. <br /> <br />The specific actions proposed for Phase IT would include: <br /> <br />., Add Highland Bowl Lift and ] 90 acres of mainly advanced and expen terrain in Highland Bowl. <br /> <br />., Add Maroon Bowl Lift and ] 89 acres of advanced and expen terrain in Maroon Bowl. <br /> <br />., Construct a catwalk between the Steeplechase and Highland Bowl lifts (Highland Bowl Catwalk). <br /> <br />. Extend snowmaking capability to cover an additional 227 acres of ski terrain (to reach a total of about 303 <br />acres) from the base area to Loge Peak. <br /> <br />The technical descriptions of the Thunderbowl, Steeplechase. Highland Bowl, and Maroon BowlliflS are shown <br />in Tab]e 3. The Thunderbowl, Steeplechase, and Maroon Bow] lifts would be top driven with power supplied <br />underground along existing or new ski trails or catwalks. The Highland Bowl Lift would be driven from the <br />bottom terminal with power supplied underground along the proposed Highland Bowl Catwalk from the base of <br />the Steeplechase Lift. The new Thunderbowl Lift would provide access to 96 acres of intermediate and advanced <br />skiing terrain; the Steeplechase Lift would provide access to 209 acres of gladed, advanced, and expen terrain; <br />the Highland Bowl Lift would provide access to about ]52 acres of open-bowl, advanced, and expert terrain; and <br />the Maroon Bow] Lift would provide access to about] 89 acres of expen-only bowl terrain. <br /> <br />Under Alternative B,live tree removal would be limited as much as possible to the lift line and catwalk corridors. <br />Lift corridors would be cleared to a minimum of 60 feet wide in forested stands to meet the Co]orado State <br />Passenger Tramway Safety Board (PTSB) standards. Additional disturbance within the corridor would include <br />excavation of tower foundations and lift tenninals. The proposed alignment of the Steeplechase Lift was selected <br />to minimize disturbance of avalanche staning zones and to follow a previously cleared survey line. <br /> <br />Sectionll <br />Alternalivu COlUjdLred ill DdaU <br /> <br />9 <br />