Laserfiche WebLink
<br />.[ <br /> <br />.0;;;;"'" <br />.... J <br />....? <br /> <br />t;}) <br />t: -,' J.,~-'J <br /> <br />ANIMAS, LA PLATA PROJECT--COLORADO AND NEW MEXICO <br /> <br />Introduction <br /> <br />The Animas"La Plata Project would be located in the Upper <br />Colorado River Basin in La Plata And Montezuma Counties of <br />southwestern Colorado and San Juan County of northwestern New <br />Mexico. The Congress authorized it as a participating project in <br />the Colorado River Storage Project. <br /> <br />Project Objectives <br /> <br />The project would be a multiple-purpose water resource <br />development. Municipal and industrial water would be furnished <br />to Durango and to the rural La Plata area in Colorado and to <br />Farmington, Aztec, Bloomfield and several smaller communities, as <br />well as the Navajo Tribe in New Mexico. The Southern Ute and Ute <br />Mountain Ute Indian Tribes would receive industrial water <br />p.imarily for the development of coal resources on their <br />reservations. The project would provide water for the irrigation <br />of Indian and non-Indian farmland in the La Plata and Mancos <br />River drainages, and opportunities would be made for recreation <br />at project reservoirs A program for developing land for <br />wildlife would compensate for wildlife losses at both reservoirs, <br />and a program would be instituted to collect and preserve <br />cultural resources. Project construction would take about ten <br />years <br /> <br />;. <br /> <br />( <br />" <br /> <br />Proposed Plan <br /> <br />;'. <br /> <br />Located southwest of Durango, RIDGES BASIN RESERVOIR, one of two <br />offstream project reservoirs, would store water pumped from the <br />Animas River by the DURANGO PUMPING PLANT. Reservoir releases <br />would be made as necessary back to the Animas River for New <br />Mexico's municipal and industrial users downstream and to <br />supplement DURANGO PUMPING PLANT flows to the DURANGO MUNICIPAL <br />AND INDUSTRIAL PIPELINE, connecting with the city's water-storage <br />reservoir Water pumped by RIDGES BASIN PUMPING PLANT, to be <br />located on the western edge of the reservoir, would be conveyed <br />in the SOUTH DURANGO WATER DISTRICT MUNICIPAL AND INDUSTRIAL <br />PIPELINE to water users in that district. Part of the Southern <br />Ute and Ute llountain Ute Indian Tribes' project water and <br />irrigation water for Colorado farmers and municipal and. <br />industrial water users would be stored in RIDGES BASIN RESERVOIR <br />and conveyed through the DRY SIDE CANAL and LONG HOLLOW TUNNEL. <br />Water would be pumped to the DRY SIDE CANAL from RIDGES BASIN <br />PUMPING PLAN~. The canal would carry water west to project land <br />in the La Plata'and Mancos River drainages and to the canal's <br />terminus for the Ute Mountain Ute Indian Tribe's industrial use. <br />Water from the La Plata River could be diverted into the DRY SIDE <br />CANAL during spring runoff by the LA PLATA DIVERSION DAM or <br />continue to flow downstream SOU"HERN UTE RESERVOIR storing <br /> <br />~ <br /> <br />(> <br />~., <br /> <br />~-, I <br /> <br />;~ <br /> <br />"';' <br /> <br />., <br />" <br /> <br />;',,, <br /><.' <br /> <br />'-\, <br /> <br />"~{ <br />