My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07553
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:51 PM
Creation date
10/12/2006 2:27:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1982
Author
Corps of Engineers
Title
Six State High Plains-Ogallala Aquifer Regional Resources Study - Summary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r.:r"."" .1t:)'/ <br />t; t.: ~ .." ' I '1 <br /> <br />for the Future, Inc. in thei r report entitled, "Research Report: I>. Study <br />Des i gned for the Hi gh PI a ins Deve I opment Project. ".!.I The report addresses <br />both tasks (study elements) and organization structure. <br /> <br />I>. major role was established for a General Contractor to act as study manager. <br /> <br />Based on the study design, the HPSC requested proposals from potential contrac- <br /> <br />tors. The council selected for the General Contractor Camp Dresser and McKee, <br /> <br />Inc. (COM), prime contractor, in association with Black and Veatch (B&V), <br /> <br />Consulting Engineers as joint venturer, and Arthur D. Little, Inc. (ADL), as <br /> <br />subcontractor. A contract was signed in September 1978 and the three firms <br />have operated as the High Plains Associates for the duration of the study.lf <br /> <br />STUDY OBJECTIVES <br /> <br />Objectives of the High Plains Study, as adopted by the High Plains Study Council, <br /> <br />were: <br /> <br />a. Determine potential development alternatives for the Hi9h Plains. <br />b. Identify and describe the policies and actions required to carry out <br />promising development strategies. <br />c. Evaluate the local, state, and national implications of these alterna- <br />tive development strategies or the absence of these strategies.1f <br /> <br />STUDY ORGANIZATION <br /> <br />Figure l shows the High Plains Study organization. In addition to the High <br />Plains Study Council and the general contractor, a state advisory group from <br /> <br />1/ The study design was prepared for EDA under Project No. OER-SIl-G-76-3 <br />(99-7-13319). It was prepared in July 1976. <br /> <br />Y High Plains Associates, "Si)(-State High Plains-Ogallala I>.quifer I>.rea <br />Study," Interim Report, January 15, 1978, page 2. <br /> <br />1f Approved by the High Plains Study Council February 21, 1977. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.