Laserfiche WebLink
<br />UPPER COLORADO MAINSTEM <br />Much abave average preclpltatian in April cambined with colder than narrmil' <br />temperatures raised spring runaff farecasts. The mainstem af the Upper Calarado is <br />expected ta produce near 130 percent of average runoff. <br /> <br />April-July streamflaw forecasts for the Upper Calarada Mainstem are as fallaws: <br /> <br />Gunnison River: <br />Much Above Average <br /> <br /> <br />ID <br />UT <br /> <br />Colorado River (mainstem): <br />Near Average <br /> <br />Dolores River: <br />Above Average <br /> <br />CO <br />NM <br /> <br />BASIN CONDITIONS - MAY 1, 1995 <br /> <br />Average <br /> <br />160% <br />140% <br />120% <br />100% <br />80% <br />60% <br />40% <br />20% <br />0% <br /> <br />150% <br /> <br />140% <br /> <br />Percent of <br />'61 - '90 <br /> <br /> <br />April <br />Precipitation <br /> <br />Water Year <br />Precipitation <br /> <br />Snow Water <br />Equivalent <br /> <br />April <br />Streamflow <br /> <br />Reservoir <br />Contents * <br /> <br />* == Percent usable capacity, not percent average contents. <br /> <br />Specific site farecasts are listed beginning an page 5. <br /> <br />Calarada Basin River Farecast Center - Natianal Weather Service <br /> <br />Page 2 <br />