Laserfiche WebLink
<br />.. <br /> <br />'.'I":"1c;' 0" <br />*; I ~/.J l..J .1 <br />,'. -- <br /> <br />March 13, 1992 <br /> <br />Lower Virqin River Project Plan of Study <br /> <br />. <br /> <br />PROPOSED GENERAL PROVISIONS <br /> <br />STUDY COSTS WILL BE SHARED 50 - 50 WITH LVVWD <br /> <br />COOPERATIVE STUDY EXPENDITURES PRIOR TO PRELIMINARY FINDINGS <br />REPORT WILL BE LIMITED TO $200,000. <br /> <br />PRELIMINARY FINDINGS REPORT TO BE BASED PRIMARILY ON EXISTING <br />DATA, but <br /> <br />WATER QUALITY SAMPLING AND SEDIMENT SAMPLING WILL BEGIN DURING <br />PRELIMINARY STUDY PERIOD <br /> <br />FOUNDATION DRILLING AND OTHER HIGH COST DATA COLLECTION SCHEDULED <br />AFTER PRELIMINARY FINDINGS REPORT <br /> <br />. <br /> <br />IF LVVWD WISHES TO INITIATE HIGH COST DATA COLLECTION EARLIER, IT <br />MAY DO SO. BOT THOSE COSTS WILL NOT BE COUNTED AS STUDY COST <br />SHARING UNLESS STUDY CONTINUES PAST PRELIMINARY STAGE. <br />