Laserfiche WebLink
<br />nC2582 <br /> <br />Lower Virqin River Project Plan of study <br /> <br />PRELIMINARY FINDINGS REPORT <br /> <br />. <br /> <br />PURPOSE: TO SHOW WHETHER THE PROJECT APPEARS TO BE FEASIBLE. <br />TO JUSTIFY CONTINUATION WITH DETAILED STUDIES. <br /> <br />METHOD: <br /> <br />PRESENT AT LEAST ONE VIABLE ALTERNATIVE. (DOES <br />NEED TO BE THE PREFERRED ALTERNATIVE). <br /> <br />WITHIN FIRST 12 MONTHS OF STUDY. co.)- $'200 t. <br /> <br />NOT <br /> <br />TIMEFRAME: <br /> <br />ISSUES OF PRIMARY CONCERN TO BE ADDRESSED: <br /> <br />QUANTIFICATION OF THE WATER RESOURCE (HOW MUCH WATER <br />WILL THERE BE IN THE FUTURE) <br />NEVADA WATER RIGHTS APPLICATION PROCESSING <br />ARRAy OF ALTERNATIVES <br />SALT REMOVED FROM RIVER <br />WATER PRODUCED <br />PROJECT COST <br />ENVIRONMENTAL FEASIBILITY <br /> <br />. <br />