My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07502
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:37 PM
Creation date
10/12/2006 2:25:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
The Colorado Big Thompson Project - Project Description
Basin
South Platte
Water Division
1
Date
4/28/1950
Title
Public Hearing on Estes Park Area Transmission Lines - General Statement by James H Knights
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><:::> <br />c; <br />~ <br />(\1 <br />C:') <br />iol-'" <br /> <br />Plant "on the line" within the next 60 days. In order to do this we must <br /> <br />erect a section of transmission line to connect the power plant to the <br /> <br />existing l15,000-volt Estes to Loveland transmission line which.now ter- <br /> <br />minates just east of Lake Estes. To connect the Marys Lake Power Plant <br /> <br />to the transmission system, we must build a transmission line from it to <br /> <br />Estes Power Plant, and to integrate the operation of both these plants <br /> <br />with western slope power features, we must interconnect them by erecting <br /> <br />a high-voltage transmission line from Estes Power Plant to connect with <br /> <br />a high-voltage cable now being installed in the Adams Tunnel. It is in <br /> <br />relation to our plan for construction of these 3 sections of transmission <br /> <br />'~~ <br /> <br />line that we are meeting here tOday, and thus, I believe, we have arrived <br /> <br />at the localized problem which we will want to develop in considerable <br /> <br />detail. <br /> <br />First; in order to clearly establish in the minds of the audience <br /> <br />the area we will be talking about, I wish to refer to Exhibit "A", "Gen- <br /> <br />eral Recreation Development Plan for Estes Park Lake". This is one of a <br /> <br />series of pl<ms comprising a "master plan" for recreational development <br /> <br />on reservoirs of the Colorado-Big Thompson Project worked out jointly be- <br /> <br />tween the National Park Service and the Bureau of Reclamation. Noting <br /> <br />the picnic areas, bathing and boating concessions, beaches, boardwalk, <br /> <br />parking facilities,and over-all landscaping plans, it will be seen that <br /> <br />considerable thought has been given to a fully integrated recreational <br /> <br />and scenic development for this area. I wish to emphasize that while <br /> <br />Exhibit "AU represents an agreed upon plan for development, only very <br /> <br />limited recreational features have been undertaken to date for the reason <br /> <br />that over-all plans are awaiting formal approval and appropriation of <br /> <br />3 <br /> <br /> <br />.", <br />
The URL can be used to link to this page
Your browser does not support the video tag.