Laserfiche WebLink
<br />Month <br /> <br />c <br /> <br />Jan, <br />Feb, <br />March <br />April <br />, May <br />C' June <br />July <br />August <br />Sept. <br />Oct. <br />Nov, <br />Dec, <br /> <br />t/ <br /> <br />~ <br /> <br />WEIGHTED MONTHLY SALINITIES AT <br />SELECTED COLORADO RIVER STATIONS!.' <br />AND RUNNING 12-MONTH NIB-INPERIAl FLOW-WEIGHTED SALINITY DIFFERENTIAL <br />(in parts per million) <br /> <br />o <br />= <br />I'--' <br />...;.... <br /> <br />.."'- <br /> <br /> Below Below Palo Verde At At Northerly Inter- <br />Hoover Dam Parker Dam Canal Near Blvthe Imperial Dam national Boundary <br />5-Year 5-Year 5-Year 5-Year 5-Year <br />avg,Y avg," avg," avg,Y avg," <br />1974.76 2002 2003 1974-76 2002 2003 1974-76 2002 2003 1974-76 2002 2003 1974.76 2002 2003 <br /> <br />Running <br />12-Month <br />Flow-Wtd, <br />Differential Ji <br />2002 2003 <br />. <br /> <br />690 582 623 709 600 665 751 613 648 913 708 711 1,041 856 891 139,1 143.5 <br />675 611 640 706 608 627 732 615 636 835 676 700 998 839 798 147.0 137,3 <br />684 605 601 699 608 621 727 549 629 805 675 679 925 783 787 152,2 137,7 <br />680 600 615 700 609 628 714 607 631 801 658 680 892 781 777 157,7 134,9 <br />677 595 621 698 602 625 709 617 633 822 679 723 962 871 878 157,6 130.8 <br />678 600 621 695 604 632 712 625 634 812 684 711 956 855 844 157,7 127,2'" <br />682 610 623 688 607 635 709 625 637 797 684 671 909 821 810 159.3 127.6 <br />690 606 620 686 609 706 616 800 701 689 907 828 867 156,1 131,0 <br />672 , <br />603 686 612 737 619 815 699 952 820 151,8 <br />680 603 689 602 739 603 854 711 1.070 899 146,3 <br />682 609 692 609 746 614 897 719 1,010 850 142.1 <br />681 609 702 615 731 629 877 756 999 887 140,9 <br /> . <br /> <br />General Notes: <br /> <br />11 Salinities based on "sum of constituents", <br /> <br />?J 5-Year averages are arithmetic <br /> <br />:JI 12-month flow-weighted differential between NIB and Imperial Dam through month shown in left column, <br />