Laserfiche WebLink
<br />. <br /> <br />" <br /> <br />;. .! <br /> <br />. <br /> <br />\, <br /> <br />\, <br /> <br />II. Upper Basin Discharqe (Acre-fee!). <br /> <br />San Juan River near <br />Bluff, Utah <br /> <br />43,500 <br /> <br /> Meas. Flow Adjusted for CRSP <br /> Surface Storaqe Chanqes <br /> % of Aug, <br />Cumulative Flow 81- year <br />October average <br />thru August (1922-2002 <br />Auqust 2003 water vears) <br />2,355,100 56,200 29% <br />2,537,300 108,800 44% <br />499,600 (16,700) -16% <br />7,887,000 157.400 28% <br /> <br />Station <br /> <br />Meas. <br />Flow <br />August <br />2003 <br /> <br />Green River at Green <br />River, Utah <br /> <br />73,100 <br /> <br />Colordo River near <br />Cisco, Utah <br /> <br />162,600 <br /> <br />At Lee Ferry <br />(Compact Point) <br /> <br />925,800 <br /> <br />III. Lower Basin Discharqe (Acre-fee!),' <br /> <br /> Cumulative Flow <br /> October <br /> August thru <br />Station 2003 Auqust <br />Below Hoover Dam 744,200 8,878.700 <br />Below Davis Dam 808,500 9,323,100 <br />Below Parker Dam 664,300 6,623,300 <br />Above Imperial Dam 485,600 5,345,800 <br /> <br />-2- <br /> <br />.,:", <br />