Laserfiche WebLink
<br />I <br />I <br />I <br /> <br />OlJ0836 <br /> <br />CHAPTER IV <br /> <br />WORK OUTLDlBS <br /> <br />I <br /> <br />Six work groups will be formed to conduct study activities for work items <br /> <br />which are described in this section. The work group leaders are responsible to <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. ensure adequate and timely completion of their study activi ties. The <br /> <br />interrelationahip between work groups is graphically illustrated in figure 6. <br /> <br />The work activities of the management group are also presented in this chapter. <br /> <br />FIGURE 6 <br /> <br />WORK GROUPS <br /> <br />MRB HYDROLOGY STUDY <br /> <br />I <br />I <br />I <br />I <br /> <br /> <br />./ <br />./ <br />./ <br /> <br /> <br />/'/ <br />, <br />/ <br />" <br />/ <br /> <br />... <br />\ "- <br />\ "- <br />\ "- <br />'\ "- <br />\ <br /> <br />Management Group <br /> <br />I <br />I <br /> <br />Surface <br />Water Supply <br />Including <br />Instream <br />Water Use <br /> <br />Ground <br />Water Depletions <br /> <br />Agricultural <br />Wa ter Use <br />Including <br />Identification <br />of Irr igated <br />Lands <br /> <br />Industr ial, <br />Municipal, <br />Energy, and <br />Rural Domestic <br />Water Use <br /> <br />, <br /> <br />I <br /> <br />-27- <br />