Laserfiche WebLink
<br />.' .' . PREUMINARY. <br /> SUBJECT TO Ry..:V""VJ <br /> TABLE 6 ~, '.,' I '- I <br />0 DEPENDABLE CAPACITY SUMMARY <br />" <br />(' ~'.. I <br />~ Energy Total Energy <br />~ Generation Potential <br />.... Alter- Installed During June, During June, Hydrologic Dependable <br /> na t i v e Caoacity July and A",mst July and AU~llst Availability Capaci ty <br /> I 1513 kw 2,012,760 kwh 3,340,704 kwh 60% 1076 kw <br /> II 2521 kw 2,817,120 kwh 5,566.368 kwh 51% 1519 kw <br /> III 3530 kw 3.344.592 kwh 7.794,240 kwh 43% 17 86 kw <br /> IV 4538 kw 2.752.752 kwh 10.019.904 kwh 27% 1422 kw <br /> <br />26 <br />