Laserfiche WebLink
<br />Title I Program <br />Colorado River Basin Salinity Control Act <br /> <br />Table 4,- Yuma Desalting Plant <br />Operation and maintenance costs <br />(1993 costs in millions of dollars) <br /> <br /> Plant status <br /> Future <br /> One-third Full full <br />Description Mothball Standby operation operation operation <br />Noncontract costs $ 3,5 $ 3.5 $ 3,5 $ 3,5 $ 3,5 <br />Service contracts 5,6 5.6 5,6 5,6 5.6 <br />Equipment replacement and modification 0,0 1.0 1.8 3,1 3.0 <br />Membranes '2.6 '2,6 '2.6 '2,6 6,0 <br />Power and chemicals 0.8 0.8 3,7 10,9 10,9 <br />Sludge disposal '0,0 '0,0 '0,0 '0,0 3,0 <br />Total O&M $ 9,9 $10,9 $14,6 $23,1 $32,0 <br />Total $12.5 $13.5 $17.2 $25,7 $32,0 <br /> <br />. <br /> <br />1 Not conmdered Q&M COlt..; considered capital coat. throuKh 1994. <br /> <br />5 <br /> <br /> <br />co <br />~ <br />i <br />tit <br /> <br /> <br />1 <br /> <br />1 <br /> <br />o <br /> <br />Full operation <br /> <br />StancIly status <br /> <br />Full operation <br /> <br />~. OM&E <br /> <br />~ Startup <br /> <br />FIlJ!l"lJJ Overhaulll <br /> <br />IIli\1I Replae81._.a. <br /> <br />Figure 2,-Variations in annual typical YDP operating costs, <br /> <br />22 <br />