Laserfiche WebLink
<br />Table 2.-Capital costs: Colorado River Basin Salinity Control Project, Title I <br /> <br />()::;:I <br />o~ <br />0"'" <br />iil- <br />g.~ <br />:Q'Q <br />-'w <br />~::J <br />~ <br />:;' <br />!.1 <br />~ <br />~ <br />&> <br />~ <br />). <br />a <br /> <br />.... <br />00 <br /> <br /> Project cost estimates <br /> Actual costs <br />ntle I (eatures April 1973 January 1979 October 1992 through <br /> price level price level price level fiscsl year 1991 Status <br /> 72.4 MGD <br /> 108 MGD capacity capacity <br />Desalting romple., unit: <br />Yuma Desalting Plant $62,100,000 $189,400,000 $264,500,000 $206,200,000 VVork Un progress <br />WMIDD irrigation drainage reduction 12,500,000 27,400,000 45,000,000 39,000,000 Future work <br />program. pending <br />Reject stream replacement studies 2,000,000 2,600,000 2,800,000 2,500,000 Work in progress <br />Main OuUet Drain Extenolon Sipbon 3,100,000 3,000,000 3,000,000 3,000,000 Completed <br />Bypass drain: U.S. and Mexico 15,400,000 23,900,000 23,200,000 23,200,000 Completed <br />Yuma Desalting Test Facility 0 11,600,000 19,400,000 19,400,000 Completed <br />Land acquisition at Painted Rock 6.000.000 7,000.000 0 0 Not required <br />Reservoir <br />Subtotal $100,100,000 $264,900,000 $357,900,000 $293,300,000 <br />Protective and Regulatory Pumping Unit $ 34,000,000 $ 34,600,000 $ 32,500,000 $ 19,600,000 Future work <br /> pending <br />Coacbella Canal Unit $ 21,100,000 $ 46,600,000 $ 47,900,000 $ 47,900,000 Completed <br />Fil!!lh and wildlife mitigation measures 300.000. 10,500,000 11.800.000 11,500,000 <br />Project cost estimate totals $166,600,000 $356,400,000 $450,100,000 $372,300,000 <br />Authorized appropriation ceiling $166,500,000 $356,400,000 $472,800,000 <br /> autborized by authorized by authorized <br /> PL 93-320 PL 96-336 ceiling <br /> June 24, 1977 Sept, 4, 1980 indexed to October 1992 <br />