My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07453
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:24 PM
Creation date
10/12/2006 2:23:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.116.A
Description
Fruitland Mesa Project
State
CO
Basin
Gunnison
Water Division
4
Date
2/28/1973
Title
Preliminary Summary Sheets - Fruitland Mesa Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,<,':,~>\ <br />Fruitland Mesa t~d~ect (Continued) <br /> <br />Pro,led Costs - Basin Fund ($l,OOO)Y <br /> <br />Project costs (October 1971 prices) <br />Soap Park Dam and Reservoir. . . <br />Crystal Creek Diversion Dam. . . <br />Curecanti Diversion Dam. . . <br />Black Mesa Conduit . . <br />Fruitland Canal. . . . <br />Gould Canal structures <br />Laterals " . " " . . . <br />Drains . . . . . . " ". <br /> <br />. <br /> <br />. . <br /> <br />. <br /> <br />13,600 <br />540 <br />125 <br />19,800 <br />21200 <br />~830 <br />1,600 <br />480 <br />380 <br /> <br />. . <br /> <br />. . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. . <br /> <br />. . . <br /> <br />. <br /> <br />. . <br /> <br />. <br /> <br />. . <br /> <br />. . . <br /> <br />Crystal Creek channel protection <br />Transitional development costs and other <br />physical property. . . . . . . . . <br />Operation and maintenance 'headquarters. <br /> <br />Total " . . 'I' . . . . . . . . . .. . <br />Annual operation, maintenance, and replace- <br />ment costs 1 6 -6 rices)........... 53 <br />1 Exclusive of construction cost and annual operation, maintenance, <br />and replacement cost to be financed by the Forest Service for recreation <br />facilities at Soap Park Reservoir. These were originally estimated re- <br />spective~ at $987,250 and $17,200. No new estimate is available. <br />gj Includes $546,000 costs for D&MC program on Gould Siphon not <br />, shown on regular project PF-2. <br /> <br />. . <br /> <br />. . <br /> <br />. <br /> <br />350 <br />30~ <br />43,21 <br /> <br />. <br /> <br />Water. Supply <br /> <br />Source: Water will be provided :from Soap, Cureca;nti, and Crystal Creeks-- <br />all tributaries of the Gwmison River and projeetirrigation. <br /> <br />Project Supply (acre-feet) <br /> <br />Di~rsions <br />Irrigation water' !/57,900 <br />y Includes 1.5 acre-feet a.rm:u.al.1y <br />for public use at Black Canyon of the <br />Gunnison National MOnument., <br /> <br />De-pletion of Colorado River (acre-feet) . .'. . . . '. . . . . . . 28,000 <br /> <br />Quality of Water <br /> <br />Chemical ana~sis indicates the project water sup;p~ is of excellent <br />quality. <br /> <br />. <br /> <br />HYdrological Data <br /> <br />Soap Park <br />Reservoir <br /> <br />Drainage area <br />Square miles <br />Mean elevation <br />Runoff (acre-feet annually)Y' <br />, M9.ximum <br />Minimum <br />Average <br />y For 1941-65 period of study. <br />4 <br /> <br />" <br /> <br />47.0 <br />10,130 <br /> <br />80,900 <br />17,600 <br />43,900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.