My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07452
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:24 PM
Creation date
10/12/2006 2:23:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1985
Title
Preliminary Assessment of the Salt Tolerant Emergent Plant (STEP) Process for the Beneficial Use and Disposal of Saline Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />'1' <br />I <br />, l I <br />i (D <br />i <br />I 0::- <br />:~ -:;, <br />I ~~~) <br />I I,:.:' <br />I <br />., <br />I <br />, <br />i1 <br />I <br />:1 <br /> <br />Chapter 2 - continued <br /> <br />Design Basis for the STEP Process <br /> <br />2-1 <br />2-6 <br />2-13 <br /> <br />STEP Process Design <br /> <br />Additional STEP PrDcess Engineering ConsideratiDns <br /> <br />CHAPTER 3 - Costs of the STEP Process fDr the Beneficial Use and <br />Disposal of Glenwood Springs Saline Water <br /> <br />Introduction . . . . . . <br /> <br />. . . . <br /> <br />3-1 <br />3-1 <br />3-4 <br />3-9 <br />3-10 <br /> <br />Basis for Estimating STEP Process Costs <br />Unit Costs of Other Elements of the STEP Process <br /> <br />1985 ConstructiDn CDStS Df the STEP Process <br /> <br />, ! <br />, <br /> <br />1985 Annual Costs Df the STEP PrDcess . . . <br /> <br />Alternative Saturated Brine Disposal Unit Costs 3-12 <br /> <br />RecommendatiDns for Additional Engineering WDrk Dn the <br />STEP Process Concept 3-12 <br /> <br />Tasks <br /> <br />. . . . . . . <br /> <br />3-13 <br />3-27 <br /> <br />References (Chapter 2 and 3) <br /> <br />CHAPTER 4 - ECDnDmic Considerations of the Salt Tolerant <br />Emergent Plant (STEP) Process <br /> <br />IntrDductiDn <br /> <br />. . , . <br /> <br />. . t . . . . . . . . . . <br /> <br />4-1 <br /> <br />Analysis Df the STEP Process as a Salt Disposal Technology. 4-1 <br />The STEP Process as a Commercial Opportunity 4-22 <br />Combined Cash FlDWS and Value 4-26 <br /> <br />Recommendations for Further Work 4-29 <br /> <br />References <br /> <br />4-33 <br /> <br />APPENDIXES <br /> <br />.FollDwing 4-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.