Laserfiche WebLink
<br />. " ~ <br />. .. . <br /> Plan III 002568 <br /> (continued) <br /> Max imum <br /> Alternative Description (mg/L) Annual Construction Overall Incremental Incremen tal <br /> Effect Cost Cost Cost Cost Cost <br /> at Imperial Effectiveness Effectiveness Effectiveness <br /> ($1000) ($1000) $1000/mg/L $1000/mg/L $1000/mg/L <br /> 5. Alternative '4 11.30 5047 <br /> A Canal Barrier 1.19 1075 903 <br /> V " " '\ 1.68 949 565 <br /> W " " .37 403 1089 <br /> G " " .57 634 1112 lLl2 <br /> Adjustment to Big Salt Waah -0.11 -1 <br /> T5.iiO 8TIif 124,570 540 --p;rr- . <br /> 6. Alternative #5 15.00 8170 <br /> Adjustment AIHB VCDP w/Barrier 4.02 4869 1211 1211 <br /> T9.02 12976 199,390 682 1211 1211 <br /> 7. Alternative 16 19.02 12976 <br /> All Laterals Pips .61 5084 8334 8334 <br /> T9.63 l806O 277 ,500 920 8334 <br /> <br />.' <br /> <br />.. <br />