Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Streamflow <br /> <br />Streamflow at key stations in the Colorado River System for April 1990 was <br />as follows: <br /> <br />April <br />Discharge <br />( 1000 a. f. ) <br /> <br />Percent <br />77 yea r <br />(1914-1990) <br />April <br />DischarRe <br /> <br />Cumulative Monthly <br />(Oct. -Apr. ) <br />Discharge <br />(lOOO a.f.) <br /> <br />Percent 77 year <br />(1914-1990) <br />Cumulative Monthly <br />(Oct. -Apr.) <br />DischarRe <br /> <br />Colorado River <br />near Cisco, Utah <br />Adjusted ~I <br /> <br />154.0 <br />121. 2 <br /> <br />24.77. ojJ" <br /> <br />1,056.0 <br />1,014.1 <br /> <br />60.6% . <br /> <br />Green River at <br />Green River, Utah <br />Adjusted "E.i <br /> <br />222.4 <br />264.0 <br /> <br />58.6% <br /> <br />970.8 <br />821.5 <br /> <br />58.87. <br /> <br />San Juan River <br />near Bluff, Utah <br />Adjusted sl <br /> <br />41.7 <br />63.7 <br /> <br />26.9% <br /> <br />352.5 <br />244.1 <br /> <br />36.1% <br /> <br />TOTAL <br /> <br />418.1 <br />448.9 <br /> <br />38.1% <br /> <br />2,379.3 <br />2,079.7 <br /> <br />55.57. <br /> <br />Colorado River <br />at Lees Ferry ~I <br /> <br />567.3 <br /> <br />4,192.3 <br /> <br />~I Adjusted for change in storage in Blue Mesa Reservoir. Storage began in Blue <br />Mesa Reservoir October 27, 1965. <br /> <br />~f Adjusted for change in storage in Flaming Gorge and Fontenelle Reservoirs. <br />Storage began in Flaming Gorge Reservoir on November 1. 1962 and in Fontenelle <br />Reservoir in October of 1964. <br /> <br />sf Adjusted for change in Navajo Reservoir. Storage began June 27, 1962. <br />N'ot adjusted for San Juan-Chama diversions. <br /> <br />21 Exclusive of Paria River discharge. <br /> <br />Power Discharlle <br /> <br />Power generation at Colorado River Storage Project power plants for.April 1990 <br />was as follows: <br /> <br /> Generating Generation Cumulative <br /> Units Megawatt Month of Monthly Generation <br /> Available Capability April (Oct. -Apr.) <br /> (Megawatt (Megawatt <br /> Hours) Hours) <br />Fontenelle 1 6 4,349 30,493 <br />Flaming Gorge 3 . 132 19,015 155,844 <br />Blue Mesa 2 98 19.713 63,247 <br />Morrow Point 1 73 25,790 82,450 <br />Crystal 1 30 14,757 32,634 <br />Glen Canyon 7 1,191 265,405 2,010,883 <br /> 15 1,530 349,029 2,375,551 <br />