My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07440
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:21 PM
Creation date
10/12/2006 2:23:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.300
Description
Narrows Unit - Legislation
State
CO
Basin
South Platte
Water Division
1
Date
5/27/1968
Author
Asst Sec of the Inte
Title
Narrows Unit Colorado Letter From the Assistant Secretary of the Interior transmitting a report on the Narrows Unit Missouri River Basin Project Colorado Pursuant to Section 9a of the Reclamation Proj
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF SUPPORTING ApPENDIXES <br />This report is substantiated by data and detailed studies presented <br />in the following listed appendixes. These appendixes are on file in <br />the regional office, Bureau of Reclamation, Denver, Colo.: <br />Appendix I. Designs and estimates. <br />Appendix II. Hydrology. <br />Appendix III. Land classification. <br />Appendix IV. Agricultural and.project economics. <br />(12) <br /> <br />~. <br /> <br />CONTENTS <br /> <br />Fage <br /> <br />List of supporting appendixes_______________________________________ 12 <br />List of exhibits_________________ ____ __ ____ _________________________ 15 <br />List of statistical tables____________________________________________ 15 <br />Summary sheets____________ ______ __ ____ __________________________ _ 17 <br /> <br />LIST OF PARTS <br /> <br />, <br /> <br />Number Title <br />I. ~n&ntittal_________________________________________________ <br />II. General description_ _ _ _ _____ ____ ______ --- ----- --------------- <br />III. Problems and needs of the area________________________________ <br />IV. Plan of development~________________________________________ <br />V. Operation, maintenance, and replacement..______________________ <br />VI. Coo~diMte.project fUnctiOllS_ _ __ ___ ____ __ --- --------- --------- <br />VII. ProJect lands__ _______ ______ ______ ------ ----- ------ - --------- <br /> <br />~~: ~~~~~~-~on-~~y~~::=::::=:::=::=:::::==:::::==:::=:=:::: <br />X. Economic and financial analyses_______________________________ <br />XI. Conclusions aDd recommendations_ --------------------------:.- <br />XII. ~i~~:kdn:;.=~~~: = = = = = ~ = = = ~:::: = =:: ~: = =: =:: =: =::: =:: =:: = <br />DETAILED CONTENTS <br />Part I-TransmittaL _ __ _ __ -____ --______ -- ---- ----------------- - - -- <br />Purpose__________________________________________________---- <br />Authority for report_ _ _ ____ ___________________________ ------ --- <br />Plan___________________________________________________------ <br />Ackno~ledgments--------------------------------------------- <br />Part6li~~~~~_~~s~~~t:~~::==::::==::::::==:~:::====::===~::=::~: <br />~~~~t.;n_-:'::::::: :'::::: =:::::: =:::::::: = =:::: :==:: = = =::: = = =: <br />General economy and resources__________________________________ <br />~~~s~~~~~i~~~o~~~~~~:::::::::::=:::::::::::::::::::::::: <br />Part III-Problems and needs of the area____________________________ <br />~~~~~o_n:::::::::::::::::::::::::=::::::::::::::::::=:::::::: <br />~~~n~~~~:te:~~~~~~~~-:~::::::::::::::::::==::::::::::::=: <br />Part IV-Plan of deve1opmenL_____________________________________ <br />Narrows dam and reservoir_____________________________________ <br />g:O~fJffdO~~~~~=:::::::,::::=::::=:=::=::::=::=::::=::: <br />Construction materials_ ______ _ __ ____ __ _________:...________ _____ __ <br />ltighUrof-~ay------------------------------------------------- <br />Housing and community facilities_______________________________ <br />JacksonLake_____________________________________________---- <br />~~oJ:~~~~~-~h~~e:::::===:::=:=:::::::=:::::=::::::==:::==: <br />AJter.natep~s_______________________________________________- <br />Weld County Dam and Reservoir site________________________ <br />Municipal and industriaJ. water supply_________________-______ <br />DefeS~Jno:~n;~;~~splant:~: ==: ~: == = ==:::::: =:::: = ::::::: :::: = <br />Riverside pumping plant_ __ ______ ___ -___ -- ----------------- <br />~~~uvrellm~~~~!~~:~::=:::::::===:::::::::::::::::::::::: <br />Biiou creek diversion cbanneL______________________________ <br />(18) <br /> <br />21 <br />28 <br />28 <br />29 <br />44 <br />48 <br />50 <br />56 <br />63 <br />70 <br />87 <br />89 <br />101 <br /> <br />21 <br />21 <br />21 <br />21 <br />23 <br />23 <br />24 <br />24 <br />25 <br />26 <br />27 <br />27 <br />28 <br />28 <br />28 <br />28 <br />29 <br />29 <br />30 <br />30 <br />80 <br />33 <br />34 <br />84 <br />85 <br />36 <br />36 <br />88 <br />38 <br />41 <br />41 <br />41 <br />42 <br />42 <br />43 <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.