Laserfiche WebLink
<br />maintenance, replacemEnt and power cost, and the length of the construction <br />period for each alternative. <br /> <br />RISK AND CONCERNS <br /> <br />There appears to be very little risk in not proceeding with the next phase <br />of the study. Cost estimates and cost effectiveness calculations were <br />based on sound data with a relatively high degree of reliability. No <br />alternative had a cost effectiveness of less than SI.9 million. <br /> <br />The Salinity Control Forum, State of Utah, and the WCWCD have all been <br />briefed on the project's cost effectiveness. Although disappointed, all <br />seeMed to acknowledge the cost effectiveness did not warrant spending <br />additional salinity control funds on the project. <br /> <br />002G11 <br /> <br />8 <br />