My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07433
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:19 PM
Creation date
10/12/2006 2:22:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1983
Author
USDOI
Title
27th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Fiscal Year 1983 Highlights <br /> <br /> <br />The runo!! begins slowly <br /> <br />Unusually late. heavy spring snows <br />and cooler Ulan usual weather during <br />May, followed by a sudden hot spell <br />in late May and early June substan- <br />tially increased runoff throughout the <br />West. However, the Upper Colorado <br />Region successfully handled the <br />record runoff. <br /> <br />Bids were opened in mid.September <br />1983 for the construction contract on <br />Upper Stillwater Dam, located about <br />40 miles northwest of Duchesne. <br />Utah. The dam, expected to cosl <br />between $50 million and $100 million, <br />has achieved worldwide attention <br />since il is to be built by a state-of-the- <br />art process using roller-compacted <br />concrete <br /> <br />Nearly 25,000 acres of federally- <br />owned land was transferred in July <br />1983 to the Stales of Utah and <br />Colorado In one of the largest land <br />transfers of its kind. <br /> <br />2 <br /> <br /> <br />As the inllows rise. so do the releases <br /> <br />Vat Tunnel, the longest ever <br />constructed in Utah, was 99 percent <br />complefe by August 1983, making It <br />the longest tunnel thus far completed <br />on the Strawberry Collection System <br />of the Central Utah Project. <br /> <br /> <br />An agreement was signed between <br />Reclamation and BLM in March 1 983 <br />for BLM to prepare informafion for <br />NEPA compliance on Aquatrain's <br />pipeline corridor. Aquatrain is a $2 <br />billion joint venture between Recla- <br />mation and Aquatrain, Inc., to <br />transport coal and other products <br />from the upper reaches of the <br />Colorado River BaSin 1,200 miles to <br />the California coast. <br />
The URL can be used to link to this page
Your browser does not support the video tag.