Laserfiche WebLink
<br /> <br />Allocation of Federal Investment <br /> <br /> <br />Ridgway Dam Intake structure under construction. <br /> <br />A preliminary allocation of total estimated <br />costs of all authorized projects is summarized <br />In this table. <br /> <br />26 <br /> <br /> <br />Installing underdraln at Ridgway Dam. <br /> <br />Project Costs Allocated <br />(Excludes Section 8 Costs) <br /> <br />(Thousands <br />of Dollars) <br /> <br />Reimbursable Allocations: <br />Irrigation <br />Power <br />Municipal & Industrial Water <br />Other <br /> <br />$2,098,250 <br />1,713,816 <br />1,03t.114 <br />3,732 <br /> <br />$4,846.912 <br /> <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs <br />Cultural Resources Activities <br />Safety of Dams <br />Total <br /> <br />Other: <br />Navajo Indian Irrigation Projecj! <br /> <br />Total Cost Allocated <br /> <br />$ 49,258 <br /> 379,797 <br /> 7.649 <br /> 33,899 <br /> 33.098 <br /> 11,428 <br />$ 515,129 <br />$ 659,581 <br />$6,021,622 <br />$ 181,992 <br /> 173.853 <br />$ 355,845 <br />$6.377,467 <br /> <br />Section 8 Costs. <br />Fish and Wildlife <br />Recreation <br /> <br />Total Costs Not Allocated <br /> <br />Total <br /> <br />'Repayment of construction costs is subject to the act of <br />July 1, 1932 (47 Stat. 564) <br /> <br /> <br />Tyzack pumping plant under construction, Red Flee!. <br /> <br />Allocations to the various purposes authorized <br />under Reclamation law are required by Sec. 6 <br />of Public t.aw 84-485, the Colorado River <br />Storage Project Act, excluding specitic fish and <br />wildlife and recreation expenditures authorized <br />by Sec. 8 of this act. Final allocation reports <br />have been prepared on the Colorado River <br />Storage Project, and on Emery County, Florida, <br />Paonia, Seedskadee, Silt, and Smith Fork <br />PartiCipating Projects, and the Vernal Unit of <br />the Central Utah Project. <br />