My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07421
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:15 PM
Creation date
10/12/2006 2:21:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
5/1/1986
Author
USDOE/WAPA
Title
Rio Grande Project Proposed Adjustment of Power Rate
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. <br /> <br />(g) Any overpayment shall be refunded with interest unless the <br />FERC determines that the administrative cost of a refund would exceed <br />the amount to be refunded, in which case no refund will be required. <br />The interest rate applicable to any refund will be determined by the <br />FERC. <br /> <br />(h) A rate confirmed and approved by the FERC on a final basis <br />shall remain in effect for such period or periods as the FERC may <br />provide or until a different rate is confirmed, approved and placed in <br />effect on an interim or final basis: Provided, That the Deputy <br />Secretary may extend a rate on an interim basis beyond the periOd <br />specified by the FERC. <br /> <br />Section 903.23 - Rate extensions. <br /> <br />(a) The following regulations sh~ll apply to the extension of <br />rates which were previously confirmed and approved by the FERC, or the <br />Federal Power Commission, or established by the Secretary of the <br />Interior, and for which no adjustment is contemplated: <br /> <br />(1) The Administrator shall give Notice of the proposed <br />extension at least 30 days before the expiration of the prior <br />confirmation and approval, except that such periOd may be shortened <br />for good cause shown. <br /> <br />(2) The Administrator shall allow for consultation and <br />comment, as provided in these procedures, for such period as the <br />Administrator may provide. One or more public information and comment <br />forums may be held, as provided in these procedures, at such times and <br />locations and with such advance Notice as the Administrator may <br />provi de. <br /> <br />(3) <br />conclusion of <br />Secretary may <br /> <br />Following notice of the proposed extension and the <br />any consultation and comment period, the Deputy <br />extend the rates on an interim basis. <br /> <br />(b) Provisional Rates and other existing rates may be extended <br />on a temporary basis by the Deputy Secretary without advance notice or <br />comment pending further action pursuant to these regulations or by the <br />FERC. The Deputy Secretary shall publish notice in the Federal <br />Register of such extension and shall prompt,ly advise the FERC of the <br />extension. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.