My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07421
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:15 PM
Creation date
10/12/2006 2:21:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
5/1/1986
Author
USDOE/WAPA
Title
Rio Grande Project Proposed Adjustment of Power Rate
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. The Branch Chief position at the Elephant Butte <br />powerplant, which had been vacant for an extended period, <br />was filled at approximately $40,000 per year. <br /> <br />4. Beginning in FY 1986, the General Services <br />Administration changed their pOlicy on vehicle rental and <br />Reclamation is now making prOjections for purchases of <br />vehicles. Purchase of all moveable equipment is amortized <br />over a 5-year period and charged to OM4 (20 percent per <br />year). This amounted to approximately $50,000 in FY 1986. <br /> <br />5. FY 1985 O&M costs for the Caballo Oam were lower than <br />expected by about $52,000 because this money was diverted <br />to emergency work. This work was again projected to be <br />done in FY 1986 along with the hiring of an engineering <br />technician. Power has responsibility to pay 40.45 percent <br />of the Caballo O&M, or $21,000. <br /> <br />E. Energy and Capacity Purchases. From FY 1965 through. FY <br />1979, energy and capaclty tor tlrmlng RGP power were purchased from <br />CRSP. However, since April 1979, no capacity firming charges have <br />been incurred, and no capacity firming is projected through FY 1989. <br />Energy fi rming was requi red in FY 1982, FY 1984, and FY 1985, but not <br />in FY 1980, 1981, and 1983. Based on the current reservoir level and <br />information from Reclamation operating personnel, no energy firming is <br />projected for FY 1986 through FY 1989. For FY 1986 and thereafter no <br />annual purchases of energy are projected for future years. <br /> <br />F. Annual Replacement Costs. Prior to FY 1963, RGP used a <br />replacement reserve accountlng method. From FY 1963 through FY 1965, <br />depreciation was computed using a straight-line method; and from FY <br />1966 through FY 1972, depreciation was computed using a <br />compound-interest method. Beginning in FY 1973, future replacement <br />costs were capitalized and added to the replacement account as shown <br />in columns 15 through 17 of the PRS (Table 2). The replacement cost <br />is added to the "allowable unpaid balance" of this account in the year <br />the replacement goes into service and then subtracted out at the end <br />of its estimated service life. The interest rate applied to <br />replacements is the current interest rate determined in accordance <br />with DOE Order RA-6120.2 and preceding Reclamation directives. <br />Estimated replacement costs for FY 1986 through FY 1989 are based on <br />the most current program budget documents. Estimated replacement <br />costs thereafter are based on projections that assume service lives of <br />faci lities established in the August 1981 publication issued by <br />Reclamation and Western entitled Replacements: Units, Service Lives, <br />Factors and on investment costs in the various plant accounts indexed <br />to the Janua ry 1985 pri ce 1 eve 1 , <br /> <br />The accumulated cost of replacements in the FY 1985 Final <br />Revised PRS at the end of FY 1994 (the rate setting year) is <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.