Laserfiche WebLink
<br />Energy Charge: <br />4.5 mi lls/kWh. <br /> <br />Mi nimum Bi 11 : <br /> <br />$1.55 per kW-month at CROD. <br /> <br />Repayment studies prepared for FY 1974 showed that a rate of <br />24.5 mills would be required for RGP payout. However, to be <br />competitive with other rates in the RGP area, the rate approved in FY <br />1978 was limited to 16.03 mills. The rate schedule WHS rlesignated <br />SW-F2R and was increased in three phases to the following: <br /> <br />Demand Charge: <br /> <br />$2.13 per kW-month for April 1978 through March 1979. <br />$2.72 per kW-month for April 1979 through March 1980, <br />$3.20 per kW-month for April 1980 and thereafter. <br /> <br />Ener gy Charge: <br /> <br />6 mi lls/kWh for April 1978 through March 1979. <br />7 mi lls/kWh for Apri 1 1979 through March 1980. <br />8.5 mi lls/kWh for April 1980 and thereafter. <br /> <br />Composite rates for SW-F2R are: <br /> <br />11.01 mi lls/kWh for Apri 1 1978 through March 1979. <br />13.4 mi lls/kWh for Apri 1 1979 through March 1980. <br />16.03 mi lls/kWh for Apri 1 1980 and thereafter. <br /> <br />,Repayment studies prepared for FY 1980 showed that a composite <br />rate of 27 mills would be required for RGP payout. Due to the <br />magnitude of the increase, the rate was increased in two phases <br />beginning September 1, 1982. The rate schedule was designated RGP-F1 <br />and included the following components: <br /> <br />Demand Charge: <br /> <br />$4.555 per kW-montl1 for September 1982 through ,August 1983. <br />$5.740 per kW-mont~ for Septemher 1983 and thereafter. <br /> <br />Energy Charge: <br /> <br />10.72 mi lls/kWh fo~ September 1982 through August 1983. <br />13.50 mills/kWh for September 1983 and thereafter. <br /> <br />7 <br />