My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07415
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:07 PM
Creation date
10/12/2006 2:19:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix O Overall Benefits and Allocation of Costs
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />2151 <br /> <br />(Cost allocations. Initial Development) <br /> <br />Segregation of costs <br /> <br />The total construction cost of the Initial Development was divided <br />into specific and joint construction oosts. Specifio construction <br />costs are those directly attributable to a single purpose and include <br />all costs to be expsnded for one purpose only. The only expenditures <br />so segregated in this allocation are those ohargeable to hydroelectric <br />power and recreational development. All other costs of tho Initial <br />Development fall in the category of joint oosts which are costs of <br />facilities used for two or more purposes. Segregation of project costs <br />for the Initial Development is shown in table 6. <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.