My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07415
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:07 PM
Creation date
10/12/2006 2:19:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix O Overall Benefits and Allocation of Costs
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />2142 <br /> <br />.(Bonofit_c~st, annlysis. Initial Developnont) <br /> <br />Tablo 2.__Inuirect benofits fron Buroau of Rocla- <br />!:Illtion exponditures: Initial Dovolopncnt <br /> <br />Typo of oontract Factor l>I:lOurrt of Indiroct <br /> (%) contrnct boncfi ts <br /> ,. <br />IIork contract 58 t, 82,460,000 ^ 47.827.000 <br /> " " <br />IJlJ.torials contract: <br />JlD.chincry, inol uuinc elootrionl 4 13,000.000 520,000 <br />Stono, triok, oo~ont 5 8,500,000 125,000 <br />struoturnl net::'.1s 3 11,000,000 330,000 <br />Lunbor and tiDlx>r 3 3,OOQ,OOO 90,000 <br />Othor 2 7,966,000 159,000 <br /> - <br />Total : ... C125,926,000 o !if' 49,351,000 <br /> <br />!if' l.nortization" of ~;49,351,000 over n poriod of 100 yoo.rs at <br />2-1/2 porcont equals ~1,348,000 per your. <br /> <br />1.N1rui.L EQUIVALEIlT FEDERi.L PROJECT COSTS <br /> <br />The Federnl project cost, which is usod for conparison rlith tho <br />total t..o.nGib10 benefits, consists of the totnl invostront or construction <br />costs plus intorest uurinb construction ninus the presont worth of tho <br />proj eot tor~1innl snl vnGo vnl ue pl us projeot operation, I:1llintononoo, nnd <br />replacencnt.. Tho annucl equivt'.lent Fouoro.l oost Vies oOr.qJutod by anor- <br />tiziIl{; the totc.1 of tho first three cests ovor tho lOci-yoar period ef <br />onnlysis nt 2-1/2 peroent interost c.ncl nduiIlb the figuro obtainod to the <br />onnual fiGure for project eperation, nuintenance, and replaconont which <br />Wo.s adjusted to thc 100-yot'.l' peried. <br /> <br />Total projeot investr~ent <br /> <br />This fiGure represented by tho construction costs as estbc.ted in <br />1>.ppondix C, "DesiGns and Estino.tes". is ;::I~,314,000. . L.ddi!1(; to this <br />tho cost of ~157,OOO for rocrontionnl features, estL,o,ted by thc No.tion- <br />0.1 Park Sorvice, Givos 0. tot"-l invostDont of ~:1'10.471,OOO. <br /> <br />DesiGns nnd csth.1l1tell fo:? tho Initial [:';',-clopncnt woro roviolVod <br />by tho Chiof Enginoers' Bcc.rd of noviow cnr:'.y tn April 1948 o.nd sub- <br />soquent to the closinc dnto for tho c..raft 0:': t.':1o Interin Reperl;. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.