Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Yampa Division, Colorado~Wyoming <br /> <br />Cross t10untain Unit. Samples of concrete aggregates <br />for Cross Mountain dam were forwarded to the Chief Engi- <br />neer for analysis. <br /> <br />Gunnison Division, Colorado <br /> <br />Curecanti Unit. Materials testing and re ports on the <br />construction naterials for the Blue MesB dam were completed. <br />Con,crete aggregates were for;larded to the Chief Engineer for <br />analysis, ?lans were layed for cowmencement of d~, site <br />surveys at the Curecanti site as soon as ;Ie.ather will permit; <br /> <br />Mi1dle Riv~r Division, Arizo~-Utah <br /> <br />Glen Canyon Unit. '"jork continued on an estiJ,nte of <br />ccst for The Gap alternate access hi ghway and on setting <br />up p"wer studies for Glen Canyon and downstream power <br />plant3 by Region III. <br /> <br />!amra River Pro.i ect. Colora10-Utah-V/yomin~ <br /> <br />"a very and Pot !look Units. Diversion dam tOTQgraphy and tail- <br />w'1.ter data were completed for First ~:C3a ditch, ,;ork was resumed <br />under the extension of the First Nesa Canal. Designs and estimate' <br />fell' Dolall Hes~ divel'sioll dam and tailwater curveS for Little Snake <br />feeder canal were carried to completion. Earthwork computations on <br />che Pot Hook Service canal are 75 percent complete. Data were <br />assembled prior to a recuest for preliminary designs and estimates <br />on Savery dam. Operation studies for Savery Ur,it '''el'~ revised to <br />include land under the First Eesa ditch. \'fork waS carried on in <br />develor,ing ttle water supply for Pot Hook lands. <br /> <br />Gurnison River Fro~ect, Colorado <br /> <br />Continued progress was made toward completion oJ' t!',e proj,"ct <br />report. <br /> <br />Smith P'Jrk Unit. The 'dater supply apr;endu wa" reviewed wit.h <br />regional and [Jenver personnel and a numoer of revisions Were 0utlinp.d. <br />The proj ect land ap;:'",ndix '"as being revised and corrected. <br /> <br />1-.' <br />U1 <br />CD <br />CO <br /> <br />Cedare.dge Unit. Strip Lorography for the pump canal and the Circle <br />ditch extension was completed. Surveys for a feeder canal frotr. Tongue <br />Creek '''ere started, i':ork or. ~lans and designs of a direct connected <br />pUMping installation was c~rried to IO per~ent ~0mpletio~. A rough <br />reoervoir operation otudy waS made to establish estimates of re5ervoi,' <br />and canal capacities. <br /> <br />'J <br />