My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07376
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:00 PM
Creation date
10/12/2006 2:18:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title I - Yuma Desalting Plant
Basin
Colorado Mainstem
Date
8/1/1988
Author
USDOI/BOR
Title
Operation and Maintenance Funding for the Yuma Desalting Plant, Draft Special Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. YO?, when it beccmes operational, will. provide prcx:luct water frem the <br /> <br />plant at approximately 295 p/m. <br />3. Well.ton-fobhawk return flow diverted to the Colorado River with an <br /> <br />average salinity of approximately 2,900 p/m. <br /> <br />4. Water fran Inperial Dam needed to make up the 1.36 maf to be delivered <br />annually to Mexi= at the NIB. <br /> <br />Since 1974, the Federal Governlrent haS nonnally bypassed to the Santa Clara <br /> <br /> <br />Slough in Mexi= all Wellton-~ return flow. By diverting this flow, a <br /> <br /> <br />differential of 115j:30 p/m between Inperial Dam and NIB can nonnally be net <br /> <br />without releasing excess dilution water, as long as the salinity of water <br /> <br />arriving at Inperial Dam is greater than approximately 840 p/m. However, <br /> <br />unless the annual water S1JFPly is greater than downstream demands and <br /> <br />storage is not available in the systen, the Federal Gove:cnlrent llD..ISt release <br /> <br />water frem storage to replace the Well.ton-fobhawk drainage flows bypassed to <br />the Santa Clara Slough. Whenever this ocx::urs, the CCIlpilation used by <br /> <br />Reclamation to a=t for all water deliveries shows a debit to the <br /> <br />Federal Governlrent. This debit is "zeroed out" whenever water is released <br /> <br />fran the systen clue to a lack of available conservation storage space. <br /> <br />The Federal Govemrrent a=m.ilated "debits" frem 1974 through 1978, <br /> <br /> <br />W\re>k \. s <br />l<(j, ~ It <br />tu~~~ <br />-\-tCt.C~ 19+ <br />~ <br /> <br />were "zeroed out" in 1979, again during the period of 1981 and 198:: <br /> <br />were "zeroed out" in 1983, and has begIm to acCUllUlate debits in 1~ <br /> <br />are a=ently projected to =nt:inue to a=mulate through at least <br />P"'lE" . > ,,'" ., ''-'''{ <br />, I'" ." . ~ ... ~~.. It. (':, ..' <br />." ,~ //~ ",'. ;,:> . .:~, >: <br />~l -,~....'rlS1Ji:.tt 'j>l ii!. K- ti <br />S. · ..." ~ ," ,,"",~ ~-''''','''' il':> :1"':, n /" ~ n ~ <br />'" "Ii;' .,!; ~ -..' ~ " -J '..~ :' -I ~ ,'. \.')j .~' <br />:, . ; .,~' " :.'" .. (I ~ '/' r': ~ J..: " '.j..~' ., <br />> ~ n" ". i '." ,.., ','. '^",' <br />~ ~~!.,. '.;.... :. G '.~ 4 ~ r,;_ " ~ ,.... -.J"~ ... <br />
The URL can be used to link to this page
Your browser does not support the video tag.