My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07373
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:59 PM
Creation date
10/12/2006 2:18:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142
Description
Trinidad Project
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1996
Author
unknown
Title
Draft Review of Operating Principles and Project Operations Trinidad Lake Project Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., -. c- ':;.' <br />l'iJd <br /> <br />. <br /> <br />1. Water for the initial and subsequent fillings and for <br />replacing evaporation and seepage losses will be acquired <br />by the State of Colorado without interference to the <br />District water supply or without additional cost to the <br />District or the United States for the Trinidad Project as <br />envisioned in House Document No. 325. <br /> <br />2. In the accounting for water in storage, evaporation and <br />seepage losses due to the permanent fishery pool snall be <br />determined using the most recent data available by the <br />Colorado State En~ineer and the District with the coopera- <br />tion of the operating agency. <br /> <br />3. There shall never be any release of water from the permanent <br />fishery pool except upon the request of the Colorado Game, <br />Fish, and Parks Commission to the Colorado State Engineer. <br /> <br />Article VI - REVIEW AND AMENDMENT <br /> <br />. <br /> <br />These operating principles may be subject to review and amendment not <br />more than once a year at the request of any of the parties' signatory; <br />provided, that at least one review shall be accomplished within the <br />first 10 years following completion of the Trinidad Dam and at least, <br />one review be accomplished every 10 years thereafter. The primary <br />object of such reviews will be obtaining optimum beneficial use of <br />water as conditions change, operating experience is gained, and more <br />technical data become available. <br /> <br />" <br /> <br />. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.