Laserfiche WebLink
<br />D. Completeness <br />The plan provides for all the facilities and investments necessary <br />to realize the projected salinity control benefits. Arrangements have <br />been made with local canal companies for 3.2 ft3; s of water to be <br />removed from the river, and the C P National Corporation has <br />indicated that a power sllpply is available. <br />The F&WS has determined that the project would not jeopardize <br />the continued existence of the endangered woundfin minnow. <br /> <br />002528 <br /> <br />19 <br />