Laserfiche WebLink
<br />Table 1 <br />INVESTMENT COSTS <br />La Verkin Springs Unit, <br /> <br />Utah <br /> <br />Feature <br /> <br />Cost <br /> <br />Upper Diversion Structure <br />Lower Diversion Structure <br />Bypass Pipeline <br />Feed Water Pipeline <br />La Verkin Springs Desalting Plant <br />Product Water Pipeline <br />Brine Pipeline <br />Purgatory Flat Disposal Facility <br />O&M Equipment <br /> <br />Subtotal <br /> <br />Total <br /> <br />$ 1,790,000 <br />740,000 <br />2,700,000 <br />1,050,000 1/ <br />25,000,000 - <br />200,000 <br />1,180,000 <br />44,000,000 <br />440,000 <br /> <br />$77,100,000 <br /> <br />8,380,000 <br /> <br />$85,480,000 <br /> <br />Interest During Construction <br /> <br />1/ Includes access road ($780,000) and water rights ($1,000,000). <br /> <br />. <br /> <br />002521 <br /> <br />12 <br />