My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07367
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:58 PM
Creation date
10/12/2006 2:17:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.851
Description
La Verkin Springs Unit - Colorado River Salinity Control Program
State
UT
Basin
Colorado Mainstem
Date
12/1/1979
Title
La Verkin Springs Unit Utah Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II. PLAN FORMULATION <br /> <br />In meeting the requirements of the Principles and Standards, a <br />number of alternative plans were considered for controlling the salt <br />loading at La Verkin Springs. The plans consisted basically of: <br />(1) Collection and total evaporation of the spring discharge, <br />(2) Collection and deep well injection of the spring discharge, <br />(3) Collection and desalting of the spring discharge, <br />(4) Interception of the recharge source of La Verkin Springs' <br />water, <br />(5) Industrial use of La Verkin Springs I water, and <br />(6) No action. <br />On the basis of the evaluations performed to date, plan formula- <br />tion indicated that the most suitable alternative would consist of <br />interception and desalting of the springflows; subsequently, feasi- <br />bility designs and cost estimates were prepared for this alternative. <br />La Verkin Springs contribute approximately 109,000 tons of salt <br />and 8,300 acre-feet of water annually to the Colorado River system. <br />The proposed plan would eliminate 95 percent, or 103,000 tons of salt <br />loading annually. The desalting process would consume 27 perc.:~ItLQr <br />3 --- <br />3.2 ft Is of spring water as brine waste, (equivalent to 2,300 acre- <br />,,-, _._ _'_H.""" ._ <br />fe~t . per year) which would need to be accommodated by purchase of <br />necessary water rights due to downstream water commitments. The <br />quality of the product water would be about 284 mglL versus the <br />present average salinity of 9,650 mg/L for the spring water. The <br />physical features of the plan are shown in Figure 2 and are described <br />below. It should be noted that because of its cost, the plan is not <br />recommended for authorization and further studies are in progress on <br />alternatives to reduce costs, as described in subsequent chapters of <br />this report. <br />A. Plan Features <br />1. Upper Diversion Structure. This diversion structure would <br />be located on the Virgin River immediately upstream from the <br /> <br />OC25:6 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.