Laserfiche WebLink
<br />. <br /> <br />D. "Hardware": <br /> <br />. <br /> <br />extended aeration package plant <br />10,000 gpd - Case/Cotter <br />blowers - 3 hp <br />Sutorbilt 3LB, 1,000 rpm, 145 cfm @ 3 psi <br /> <br />. <br /> <br />. <br /> <br />IV. PLANT OPERATION <br /> <br />A. Process Variables: sludge return rate, timing of aeration <br />cycle and amount of sludge wasting <br /> <br />. <br /> <br />B. Residuals Handling: Screenings are trucked to Trinidad's <br />dump. <br /> <br />C. Plant Operation <br /> <br />1. Process or equipment problem history: none <br /> <br />2. Outfall inspection: no evidence of direct discharge <br /> <br />3. Personnel and personal aspects: The plant receives good <br />maintenance and it is scrubbed down every morning. The .! <br />plant is operated on a part-time basis by two employees. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />128 <br /> <br />. <br />