Laserfiche WebLink
<br />0010'1:' <br /> <br />. <br /> <br />. <br /> <br />2. BLUESTONE PROJElCT <br /> <br />a. FINANCIAL AND ECONOMIC ANALYSIS ESSENTIALLY COMPLETED <br /> <br />b. DRAFT OF REPORT BEING REVIEWED. ANTICIPATE COMPLETION <br />OF PROPOSED REPORT LATER THIS FISCAL YEAR. <br /> <br />3. GRAND MESA PROJElCT <br /> <br />a. FEASIBILITY DESIGNS AND ESTIMATES BEING PREPARED FOR <br />PROJECT FEATURES <br /> <br />b. PROPOSED FEASIBILITY REPORr SCHEDULED - JUNE 1970 <br />4. LOWER YAMPA PROJElCT <br /> <br />a. LAND CLASSIFICATION AND DRAINAGE FIELD WORK ABCUT <br />25 PERCENT COMPLETE <br /> <br />b. PROPOSED FEASIBILITY REPORr SCHEDULED - FY 1974 <br /> <br />5. YELLOW JACKET <br /> <br />a. PROPOSED REPORT UNDER CONSIDERATION BY LOCAL AND <br />STATE AGENCIES. BIG GAME MITIGATION FEATURES BEING <br />REVIEWED BY INTERESTS INVOLVED. <br /> <br />6. UPPER GUNNISON PROJECT <br /> <br />a. FOUNDATION EXPLORATIONS COMPLETED AT DAM SITES <br /> <br />b. TWO DAMSITES - BANANA RANCH AND HINKLE - SHOW UNFAVORABLE <br />CONDITIONS <br /> <br />c. PROPOSED FEASIBILITY REPORr SCHEDULED TO BE COMPLETED <br />BY MID FY 1971 <br /> <br />D. SPECIAL STUDIES <br /> <br />1. SALINITY CONTROL <br /> <br />a. STUDY AND REPORT PERFORMED JOINTLY BY BUREAU AND <br />FWPCA. REPORT IN DRAFT FORM AND BEING FINALIZED. <br /> <br />12 <br /> <br />