Laserfiche WebLink
<br />fJOlli1'l <br /> <br />. <br /> <br />. <br /> <br /> <br />V. POWER GENERATION AND TRANSMISSION <br /> <br />A. PRESENT INSTALLED CAPACITY IS 1,128 MEGAWATTS MID IS LOCATED <br />AT GLEN CANYON (950), FLAMING GORGE (108), FONTENELLE (10), <br />AND BLUE MESA (60) <br /> <br />B. MORROW POINT (120) WILL BE ADDED IN 1970. IF APPROPRIATIONS <br />FORTHCOMING, CRYSTAL (28) IN 1976 AND CENTRAL UTAH (130) IN <br />1976 AND 1977 WILL BRING TOTAL INSTALLED CAPACITY TO 1,356 <br />MEGAWATTS. ONLY 60 MEGAWATTS OF MORROW POINT WILL BE AVAIL- <br />ABLE UNTIL CRYSTAL IS FINISHED. <br /> <br />10 <br />